Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br /> 12. NAME <br /> NESTOR SANTANA, PE <br /> <br /> 13. ROLE IN THIS CONTRACT <br />Construction Administration Services & <br />Inspections, Cost Estimates; Structures; <br />Threshold Inspections <br /> <br /> 14. YEARS EXPERIENCE <br /> a. TOTAL <br />25 <br /> <br /> b. WITH CURRENT FIRM <br />3 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />R. J. BEHAR & COMPANY, INC. <br />6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, Florida 33332 <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S. Civil Engineering, University of Puerto Rico, 1994 <br /> <br /> 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Florida PE License No. 85785 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Santana has numerous years of experience in construction management for new construction and remedial projects of existing structures for <br />the educational, pharmaceutical, sports & recreation, commercial sectors, and water and wastewater modernization programs. He has been <br />accountable for ensuring quality, safety and schedules according to specifications, reviewing contract plans/specifications covering all building <br />construction and mechanical and electrical installations, and developing preliminary findings on specifications, estimates, and recommendations <br />for contract change orders. His additional training includes AHIT Training; United States Army Corps of Engineers Construction Quality <br />Management for Contractors Training Course; and OSHA 30 Hours, CTQP Final Estimates I&I, QC Manager. <br />19. RELEVAN T PROJECT S <br /> <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />S-151 Structure Replacement and Automation, Broward County, Florida – South <br />Florida Water Management District (SFWMD) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Construction Manager: He is providing observation and documentation of the construction to ensure the work is performed according to the <br />project drawings and specifications. He supervises construction meetings; reviews shop drawings, RFIs, and coordinates with the DPM. The <br />project consists of the removal of six 7’ x 98’ corrugated metal pipes, construction of four cast in place concrete 8’ wide x 8’ high x 36’ long box <br />culverts with wing walls, stop log recesses, remote controlled stainless steel gates, stilling wells, relocation of existing staff gauges, concrete <br />platforms, LP tank, fencing, gates, new precast control building for system controls and generator. Construction Cost: $5,584,000 <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Miramar Parkway Streetscape from 68th Avenue to 64th Avenue CEI Services, <br />City of Miramar/FDOT, District 4/Federal Highway Administration <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Senior Project Engineer assisting the City in complying with all State and Federal Equal Employment Opportunity (EEO) requirements as they <br />apply to this project, including the provisions of the U.S. DOT, the Federal Highway Administration, and the U.S. Department of Labor. He is <br />responsible for all construction inspections, overseeing the resident compliance specialist, and performing project clos e-out. Project Length: <br />0.58 miles <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Citywide Pedestrian Safety Project, City of Dania Beach/FDOT/FHWA <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION (If applicable) <br />2020 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Senior Project Engineer who is coordinating with and providing FOOT with all the required information to ensure compliance wi th all LAP <br />requirements, oversee the inspection team and the resident compliance specialist, keep the construction contract time established, and perform <br />Final Construction Close-out. Fees Paid: $91,000 Construction Costs: $1,000,000. <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Riverview Pump Station New Generator, Fire Suppression and Main Switch <br />Disconnect, City of Miami, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Cost Estimator who prepared cost estimates and specifications for the replacement of the Riverview Pump Station Emergency Generator and <br />pumps interconnection in the City of Miami. The pump station is part of the city's stormwater system. The project also includes a subconsultant <br />design of a new Fire Suppressant System and Main Switch Disconnect for the Pump Station. <br />Cost/Fees Paid: $74,200.00; Construction Cost: $935,000 (Estimated) <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) <br /> Lakeside Community Hurricane Damage Repair, Miami-Dade County, Florida – <br />Town of Medley <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Cost Estimator who was responsible for the cost data to repair the damaged seawalls due to Hurricane Irma. Erosion control methods, pollution <br />prevention precautions, and earthwork construction are included in the project. He prepared a comprehensive structural assessment report, <br />identifying any seawall deficiencies along the whole perimeter of the Lakeside Community Center. He participated in preparing the FEMA <br />documents required to secure funding for the repairs. Cost/Fees Paid: $83,756; Construction Cost: $1,352,042.00. <br /> STANDARD FORM 330 (1/2004) PAGE 2 <br /> <br /> <br /> <br /> Section E - Page | 25