|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br /> 12. NAME
<br />MICHELLE LEON, EI
<br />
<br /> 13. ROLE IN THIS CONTRACT
<br />Traffic Engineering & Studies; Construction
<br />Administration Services and Inspections.
<br />
<br /> 14. YEARS EXPERIENCE
<br /> a. TOTAL
<br />7
<br />
<br /> b. WITH CURRENT FIRM
<br />6
<br />15. FIRM NAME AND LOCATION (City and State)
<br />R.J. BEHAR & COMPANY, INC.
<br />6861 SW 196th Avenue, Suite 302
<br />Pembroke Pines, Florida 33332
<br />16. EDUCATION (Degree and Specialization)
<br />B.S. Civil Engineering, Florida International University/ 2012
<br />
<br /> 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />Engineer Intern #: 1100019645, 2016
<br />Certifications: TIN #: C440540877610
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />CERTIFICATIONS: TIN #: L500540877610
<br />▪ Earth Work I & II
<br />▪ Asphalt Paving Level I & II
<br />▪ Asphalt Plant I
<br />▪ Final Estimates I & II
<br />▪ Pile Driving Inspector
<br />▪ Drilled Shaft Inspector
<br />▪ FDOT Concrete Field Technician Level 1
<br />▪ ACI Concrete Field Technician
<br />▪ Stormwater Erosion Sedimentation Control
<br />▪ US DOT Hazmat Certification Class
<br />▪ APNGA Portable Nuclear Gauge
<br />▪ FDOT Critical Structures
<br />▪ FDOT MSE Wall
<br />▪ Advanced Maintenance of Traffic
<br />19. RELEVANT PROJECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />City Center and Traffic Signals Warrant Analysis – City of Pembroke Pines,
<br />Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer: She performed the traffic counts including turning movements counts. The objective of this traffic study was to determine the
<br />impact of the vehicular traffic generated from the proposed development project. The traffic analyses focused on determining the effects in a 2-
<br />year projection time period and assessed the existing and future conditions with and without the project’s generated vehicular traffic. Th e scope
<br />of work included traffic data collection, trip generation analysis, trip distribution, trip assignment, crash history and capacity/level -of-service
<br />(LOS) analyses. Cost/Fees Paid: $57,873.75; Construction Cost: Study
<br />
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Gilbert Samson Ocean Front Park, Miami-Dade County, Florida – City of Sunny
<br />Isles Beach
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />
<br />CONSTRUCTION (If applicable)
<br />2017
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Construction Inspector/Resident Project Representative: She was responsible for overseeing the construction of a sanitary sewer grinder pump
<br />with connection to Dade County Facilities and new driveway access from a Florida Department of Transportation road, Collins Avenue. The
<br />project also included architectural plans for the addition of two bathroom stalls, full plumbing and electrical upgrades. She was also responsible
<br />for overseeing the landscaping in the park, including a new stage installed on the site. The project also included all new exterior and interior
<br />lighting. Cost/Fees Paid: $141,478.00 Construction Cost: $3 million; Project Length: 2.9 acres.
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Waterline Design along NE16th Avenue, NE 146th Street and NE 18th Avenue,
<br />Miami-Dade County, Florida – City of North Miami
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer: She conducted inspections and closing out of the project during construction for the water line installation. The project
<br />includes approximately 3,255 ft of new 16-inch DIP water line. Cost/Fees Paid: $87,600.00; Construction Cost: $904,352.00
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />ITS Shelters Homestead Construction CMS, Miami-Dade County, FL – South
<br />Florida Water Management District (SFWMD)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />
<br />CONSTRUCTION (If applicable)
<br />2019
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Inspector: She was responsible for providing construction management and inspection support, including performing field inspections of
<br />the construction effort to verify conformance to the contract plans and specifications; preparing daily reports documenting construction
<br />performance and inspections; photographing documentation of construction activities on a daily basis; attending progress meet ings;
<br />coordinating and handling of submittals and requests for Information (RFIs) with the DCM as necessary; performing field inspections to review
<br />and verify environmental protection measures installed by the Construction Contractor are complying with regulatory requirements; verifying the
<br />Construction Contractor work performed and documented in Construction Contractor payment applications; and coordinating all the materials
<br />testing during the construction. Cost/Fees Paid: $105,300.00 Construction Cost: $1,328,000.00
<br />
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />NW 35th Avenue Greenway Enhancement, Broward County, F lorida – City of
<br />Lauderhill
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />
<br />CONSTRUCTION (If applicable)
<br />2018
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Inspector: She was responsible for providing construction engineering and inspection support services for conversion of a jogging path to
<br />a Greenway. The project included construction of decorative edge treatment bounding both sides of the greenway, seven asphalt connections to
<br />the existing path, signing and pavement marking improvements for bicycle traffic, landscaping, and pedestrian lighting. Cost/Fees Paid:
<br />$106,989.00 Construction Cost: $599,982.00 Project #: 431710-1-58-01 Project Length: 0.569 miles
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 Section E - Page | 27
|