Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br /> 12. NAME <br />MICHELLE LEON, EI <br /> <br /> 13. ROLE IN THIS CONTRACT <br />Traffic Engineering & Studies; Construction <br />Administration Services and Inspections. <br /> <br /> 14. YEARS EXPERIENCE <br /> a. TOTAL <br />7 <br /> <br /> b. WITH CURRENT FIRM <br />6 <br />15. FIRM NAME AND LOCATION (City and State) <br />R.J. BEHAR & COMPANY, INC. <br />6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, Florida 33332 <br />16. EDUCATION (Degree and Specialization) <br />B.S. Civil Engineering, Florida International University/ 2012 <br /> <br /> 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Engineer Intern #: 1100019645, 2016 <br />Certifications: TIN #: C440540877610 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />CERTIFICATIONS: TIN #: L500540877610 <br />▪ Earth Work I & II <br />▪ Asphalt Paving Level I & II <br />▪ Asphalt Plant I <br />▪ Final Estimates I & II <br />▪ Pile Driving Inspector <br />▪ Drilled Shaft Inspector <br />▪ FDOT Concrete Field Technician Level 1 <br />▪ ACI Concrete Field Technician <br />▪ Stormwater Erosion Sedimentation Control <br />▪ US DOT Hazmat Certification Class <br />▪ APNGA Portable Nuclear Gauge <br />▪ FDOT Critical Structures <br />▪ FDOT MSE Wall <br />▪ Advanced Maintenance of Traffic <br />19. RELEVANT PROJECTS <br /> <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />City Center and Traffic Signals Warrant Analysis – City of Pembroke Pines, <br />Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Engineer: She performed the traffic counts including turning movements counts. The objective of this traffic study was to determine the <br />impact of the vehicular traffic generated from the proposed development project. The traffic analyses focused on determining the effects in a 2- <br />year projection time period and assessed the existing and future conditions with and without the project’s generated vehicular traffic. Th e scope <br />of work included traffic data collection, trip generation analysis, trip distribution, trip assignment, crash history and capacity/level -of-service <br />(LOS) analyses. Cost/Fees Paid: $57,873.75; Construction Cost: Study <br /> <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Gilbert Samson Ocean Front Park, Miami-Dade County, Florida – City of Sunny <br />Isles Beach <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION (If applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Construction Inspector/Resident Project Representative: She was responsible for overseeing the construction of a sanitary sewer grinder pump <br />with connection to Dade County Facilities and new driveway access from a Florida Department of Transportation road, Collins Avenue. The <br />project also included architectural plans for the addition of two bathroom stalls, full plumbing and electrical upgrades. She was also responsible <br />for overseeing the landscaping in the park, including a new stage installed on the site. The project also included all new exterior and interior <br />lighting. Cost/Fees Paid: $141,478.00 Construction Cost: $3 million; Project Length: 2.9 acres. <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Waterline Design along NE16th Avenue, NE 146th Street and NE 18th Avenue, <br />Miami-Dade County, Florida – City of North Miami <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Engineer: She conducted inspections and closing out of the project during construction for the water line installation. The project <br />includes approximately 3,255 ft of new 16-inch DIP water line. Cost/Fees Paid: $87,600.00; Construction Cost: $904,352.00 <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />ITS Shelters Homestead Construction CMS, Miami-Dade County, FL – South <br />Florida Water Management District (SFWMD) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Inspector: She was responsible for providing construction management and inspection support, including performing field inspections of <br />the construction effort to verify conformance to the contract plans and specifications; preparing daily reports documenting construction <br />performance and inspections; photographing documentation of construction activities on a daily basis; attending progress meet ings; <br />coordinating and handling of submittals and requests for Information (RFIs) with the DCM as necessary; performing field inspections to review <br />and verify environmental protection measures installed by the Construction Contractor are complying with regulatory requirements; verifying the <br />Construction Contractor work performed and documented in Construction Contractor payment applications; and coordinating all the materials <br />testing during the construction. Cost/Fees Paid: $105,300.00 Construction Cost: $1,328,000.00 <br /> <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />NW 35th Avenue Greenway Enhancement, Broward County, F lorida – City of <br />Lauderhill <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION (If applicable) <br />2018 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Inspector: She was responsible for providing construction engineering and inspection support services for conversion of a jogging path to <br />a Greenway. The project included construction of decorative edge treatment bounding both sides of the greenway, seven asphalt connections to <br />the existing path, signing and pavement marking improvements for bicycle traffic, landscaping, and pedestrian lighting. Cost/Fees Paid: <br />$106,989.00 Construction Cost: $599,982.00 Project #: 431710-1-58-01 Project Length: 0.569 miles <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 Section E - Page | 27