Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br /> 12. NAME <br />JOSSMEL CRUZ-GARCIA, MS, EI <br /> <br /> 13. ROLE IN THIS CONTRACT <br />Bridges, Seawall Structures, Buildings, <br />Water & Wastewater Plants, Structures <br /> <br /> 14. YEARS EXPERIENCE <br /> a. TOTAL <br />3 <br /> <br /> b. WITH CURRENT FIRM <br />3 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />R.J. BEHAR & COMPANY, INC. <br />6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, Florida 33332 <br />16. EDUCATION (Degree and Specialization) <br />M.E. Structural Engineering, University of Puerto Rico, July 16, 2017 <br />B.S. Civil Engineering, University of Puerto Rico, June 2015 <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Engineer Intern #: 1100023398, 2019 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />At RJ Behar, he works in the design of structural elements and performs construction inspections of infrastructure and building <br />projects. He is proficient in MathCAD and has a thorough understanding of advanced structural engineering and the associated <br />computer skills. 19. RELEVANT PROJECTS <br /> <br />a. <br />(1) TITLE AND LOCATION (City and State) <br /> SR 25/Okeechobee Road from W. 7th Avenue to NW 36th Street, Miami-Dade <br />County, Florida – FDOT, District 6 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />2020 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Structural Engineer: As part of the post-design services, he was responsible for reviewing the mast arm and overhead cantilever sign shop <br />drawings; reviewing the mast arm design calculations shop drawings; reviewed the cantilever sign foundation shop drawings; reviewed the multi- <br />post foundation shop drawings; designed spread footings for the light pole; and performed the structural designed of the barrier wall for pier <br />protection. Project Length: 1.1 miles; Project #: 425979-2-32-01; Cost/Fees Paid: $524,942.00; Construction Cost: 1,680,000.00 <br /> <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />S-40, S41 and S-44 Gate Replacements and Concrete Repairs, South Florida <br />Water Management District <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Structural Project Engineer in charge of the update to the design of the structural elements. The project consists of the design, fabrication and <br />installation of new stainless steel vertical lift roller gates and frames for coastal structures S-40, S-41 and S-44; replacing the existing hydraulic <br />hoist systems to a new cable (rope) drum hoist system for structures S-40 and S-41; furnishing and installing riprap at the embankments for <br />structures S-40, S-41 and S-44; and to address civil/structural/mechanical/electrical deficiencies. Work Order: 4600003087-WO2 <br />Cost/Fees Paid: $315,550 - Construction Cost: $8,500,000 (Estimated). <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Florida Mango Road over PBC L-2 Canal, Palm Beach County, Florida – Palm <br />Beach County Roadway Division <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Structural Engineer who performed the structural calculations for the culvert end walls design and prepared the plans. <br />Scope of services included drainage design, roadway improvements, force main & water main design, pavements marking and signing, and <br />permitting. RJ Behar also coordinated the plans with the City of West Palm beach and obtained the Health Department permits for all relocated <br />utilities. Cost/Fees Paid: $129, 894.89; Construction Cost: $901,590.61 (Estimated). <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Booster Stations Seawall Repair #1, Miami-Dade County, Florida – Town of <br />Medley <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br />2020 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Structural Lead Engineer for designing rows of pre-stressed soil anchors (or similar drilled-in tiebacks) to provide horizontal resistance for the <br />upper portion of an existing seawall. The repair will run the full length of the south pump station seawall plus roughly 10’ on each side of the pump <br />station building. Structural design of the wall will follow the requirements and recommendations of the Florida De partment of Transportation <br />Structure Design Guidelines, dated January 2016, Chapter 3 for Retaining Walls. Wall design calculations, assumptions, etc., will be documented <br />in a computation book report. He is also responsible for assisting with hydraulic calculations, estimates of probable cost and permitting. <br />Cost/Fees Paid: $41,961.37 – Construction Cost: N/A. <br /> <br /> <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />B 134 Paint Building, Palm Beach County, Florida – South Florida Water <br />Management District (SFWMD) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Structural Designer. He provided structural engineering services for the project which included wind loading calculations on the prefabricated <br />building, foundation calculations and reinforcement design. This input will be used in producing plans and SFWMD standard specifications will be <br />used to tailor towards this project. RJ Behar provided input in the engineering design report. <br />Project #: 101095; Cost/Fees Paid: $23,400; Construction Cost: $543,136. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />Section E - Page | 28