|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br /> 12. NAME
<br />JOSSMEL CRUZ-GARCIA, MS, EI
<br />
<br /> 13. ROLE IN THIS CONTRACT
<br />Bridges, Seawall Structures, Buildings,
<br />Water & Wastewater Plants, Structures
<br />
<br /> 14. YEARS EXPERIENCE
<br /> a. TOTAL
<br />3
<br />
<br /> b. WITH CURRENT FIRM
<br />3
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />R.J. BEHAR & COMPANY, INC.
<br />6861 SW 196th Avenue, Suite 302
<br />Pembroke Pines, Florida 33332
<br />16. EDUCATION (Degree and Specialization)
<br />M.E. Structural Engineering, University of Puerto Rico, July 16, 2017
<br />B.S. Civil Engineering, University of Puerto Rico, June 2015
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Engineer Intern #: 1100023398, 2019
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />At RJ Behar, he works in the design of structural elements and performs construction inspections of infrastructure and building
<br />projects. He is proficient in MathCAD and has a thorough understanding of advanced structural engineering and the associated
<br />computer skills. 19. RELEVANT PROJECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br /> SR 25/Okeechobee Road from W. 7th Avenue to NW 36th Street, Miami-Dade
<br />County, Florida – FDOT, District 6
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />2020
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Structural Engineer: As part of the post-design services, he was responsible for reviewing the mast arm and overhead cantilever sign shop
<br />drawings; reviewing the mast arm design calculations shop drawings; reviewed the cantilever sign foundation shop drawings; reviewed the multi-
<br />post foundation shop drawings; designed spread footings for the light pole; and performed the structural designed of the barrier wall for pier
<br />protection. Project Length: 1.1 miles; Project #: 425979-2-32-01; Cost/Fees Paid: $524,942.00; Construction Cost: 1,680,000.00
<br />
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />S-40, S41 and S-44 Gate Replacements and Concrete Repairs, South Florida
<br />Water Management District
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Structural Project Engineer in charge of the update to the design of the structural elements. The project consists of the design, fabrication and
<br />installation of new stainless steel vertical lift roller gates and frames for coastal structures S-40, S-41 and S-44; replacing the existing hydraulic
<br />hoist systems to a new cable (rope) drum hoist system for structures S-40 and S-41; furnishing and installing riprap at the embankments for
<br />structures S-40, S-41 and S-44; and to address civil/structural/mechanical/electrical deficiencies. Work Order: 4600003087-WO2
<br />Cost/Fees Paid: $315,550 - Construction Cost: $8,500,000 (Estimated).
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Florida Mango Road over PBC L-2 Canal, Palm Beach County, Florida – Palm
<br />Beach County Roadway Division
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Structural Engineer who performed the structural calculations for the culvert end walls design and prepared the plans.
<br />Scope of services included drainage design, roadway improvements, force main & water main design, pavements marking and signing, and
<br />permitting. RJ Behar also coordinated the plans with the City of West Palm beach and obtained the Health Department permits for all relocated
<br />utilities. Cost/Fees Paid: $129, 894.89; Construction Cost: $901,590.61 (Estimated).
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Booster Stations Seawall Repair #1, Miami-Dade County, Florida – Town of
<br />Medley
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If applicable)
<br />2020
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Structural Lead Engineer for designing rows of pre-stressed soil anchors (or similar drilled-in tiebacks) to provide horizontal resistance for the
<br />upper portion of an existing seawall. The repair will run the full length of the south pump station seawall plus roughly 10’ on each side of the pump
<br />station building. Structural design of the wall will follow the requirements and recommendations of the Florida De partment of Transportation
<br />Structure Design Guidelines, dated January 2016, Chapter 3 for Retaining Walls. Wall design calculations, assumptions, etc., will be documented
<br />in a computation book report. He is also responsible for assisting with hydraulic calculations, estimates of probable cost and permitting.
<br />Cost/Fees Paid: $41,961.37 – Construction Cost: N/A.
<br />
<br />
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />B 134 Paint Building, Palm Beach County, Florida – South Florida Water
<br />Management District (SFWMD)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Structural Designer. He provided structural engineering services for the project which included wind loading calculations on the prefabricated
<br />building, foundation calculations and reinforcement design. This input will be used in producing plans and SFWMD standard specifications will be
<br />used to tailor towards this project. RJ Behar provided input in the engineering design report.
<br />Project #: 101095; Cost/Fees Paid: $23,400; Construction Cost: $543,136.
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />Section E - Page | 28
|