Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br /> 12. NAME <br />NANETTE AKYAZ-GOMEZ <br /> <br /> 13. ROLE IN THIS CONTRACT <br /> <br />CAD - Roadway, Streets Design Sidewalks, <br />Parking, SP&M; Civil/Site, Parks, Lighting; <br />Drainage, Stormwater, Water, Wastewater <br /> <br /> 14. YEARS EXPERIENCE <br /> a. TOTAL <br />20 <br /> <br /> b. WITH CURRENT FIRM <br />18 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br /> R. J. BEHAR & COMPANY, INC. <br /> 6861 SW 196th Avenue, Suite 302 <br /> Pembroke Pines, FL 33332 <br />16. EDUCATION (Degree and Specialization) <br />A.A. Degree/Broward Community College/1992 <br /> <br /> 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br /> N/A <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />At RJ Behar, Ms. Akyaz is responsible for plans preparation in both MicroStation and CAD software for roadway and civil engineering projects. <br />Her certifications include FDOT CAD Update Training Seminar, FDOT PPM Design Update Training, AutoCAD Release 12 - Florida <br />International University, FDOT/FICE - Load and Resistance Factor Design (LRFD) Training, Geopak Road 1 Training. <br />19. RELEVANT PROJECTS <br /> <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Haverhill Road from N. of Caribbean Boulevard to Bee Line Highway, Palm <br />Beach County, FL - Palm Beach County <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Designer: She is responsible for roadway design plans. The scope of services includes drainage improvements , signalization, pavement <br />and marking, Temporary Traffic Control Plans (TTCP), utility coordination and permitting. Project Length: 1.65 miles <br />Cost/Fees Paid: $582,734.24 - Construction Cost: $9,000,000 (Estimated) <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />NE 151st Street Improvements, Miami-Dade County, Florida – Oleta Partners <br />LLC/Miami-Dade County <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Designer. She is responsible for roadway design plans. The scope of the project included roadway design, Temporary Traffic Control <br />Plan (TCP) design, pavement marking and signing, signalization, lighting, drainage and permitting, utility coordination, contamination assessment <br />and wetland delineation/assessment. <br />Project #: N/A; Cost/Fees Paid: $498,000.00; Construction Cost: $5,757,000; Project Length: 0.876 miles. <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />NW 87th Avenue, Miami-Dade County, Florida – Florida Department of <br />Transportation (FDOT), District 6 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Roadway Designer: She assisted with roadway design and was responsible for quantities. The scope of services for this project includes <br />Roadway/Traffic Control Plan (TCP) design, pavement marking and signing, signalization, lighting, drainage and permitting, bridge construction, <br />utility coordination, traffic study, traffic counts, traffic projections, and traffic warrants services. <br />Project No.: 405615-3-52-01 Project Length: 1.90 miles; Cost/Fees Paid: $2,994,823.00; Construction Cost: $34,800,000 (Estimated) <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />SR-5/US-1/Biscayne Boulevard Resurfacing from NE 199th Street to NW 213th <br />Street, Miami-Dade County, Florida – FDOT, District 6 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Designer responsible for the production of the roadway plans. The scope of services includes milling and resurfacing, signing and <br />pavement markings, traffic control plans and ADA and pedestrian features upgrades. Project Length: 1.2 miles Project No.: 414624-3-32-01; <br />Cost/Fees Paid: $228,638; Construction Cost: $3,520,907.11 <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Design/Build for the Reconstruction of SE 3rd Street, Belle Glade, Florida – FDOT, <br />District 4 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTION (If applicable) <br />2013 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Designer: She was responsible for the production of roadway plans, signing and pavement marking plans and quantities. The scope of <br />this project included roadway plans, drainage design, signing and marking plans and utility relocation pl ans. The design included the use of filter <br />fabric and a thick sub-base in lieu of demucking the roadway. <br />Project No.: 426482-1-52-01 Project Start: 1/15/2010 Project Complete: 9/30/2013 Project Length: 0.3 miles. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br /> <br />Section E - Page | 32