|
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br /> 12. NAME
<br />NANETTE AKYAZ-GOMEZ
<br />
<br /> 13. ROLE IN THIS CONTRACT
<br />
<br />CAD - Roadway, Streets Design Sidewalks,
<br />Parking, SP&M; Civil/Site, Parks, Lighting;
<br />Drainage, Stormwater, Water, Wastewater
<br />
<br /> 14. YEARS EXPERIENCE
<br /> a. TOTAL
<br />20
<br />
<br /> b. WITH CURRENT FIRM
<br />18
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br /> R. J. BEHAR & COMPANY, INC.
<br /> 6861 SW 196th Avenue, Suite 302
<br /> Pembroke Pines, FL 33332
<br />16. EDUCATION (Degree and Specialization)
<br />A.A. Degree/Broward Community College/1992
<br />
<br /> 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br /> N/A
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />At RJ Behar, Ms. Akyaz is responsible for plans preparation in both MicroStation and CAD software for roadway and civil engineering projects.
<br />Her certifications include FDOT CAD Update Training Seminar, FDOT PPM Design Update Training, AutoCAD Release 12 - Florida
<br />International University, FDOT/FICE - Load and Resistance Factor Design (LRFD) Training, Geopak Road 1 Training.
<br />19. RELEVANT PROJECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Haverhill Road from N. of Caribbean Boulevard to Bee Line Highway, Palm
<br />Beach County, FL - Palm Beach County
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Designer: She is responsible for roadway design plans. The scope of services includes drainage improvements , signalization, pavement
<br />and marking, Temporary Traffic Control Plans (TTCP), utility coordination and permitting. Project Length: 1.65 miles
<br />Cost/Fees Paid: $582,734.24 - Construction Cost: $9,000,000 (Estimated)
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />NE 151st Street Improvements, Miami-Dade County, Florida – Oleta Partners
<br />LLC/Miami-Dade County
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Designer. She is responsible for roadway design plans. The scope of the project included roadway design, Temporary Traffic Control
<br />Plan (TCP) design, pavement marking and signing, signalization, lighting, drainage and permitting, utility coordination, contamination assessment
<br />and wetland delineation/assessment.
<br />Project #: N/A; Cost/Fees Paid: $498,000.00; Construction Cost: $5,757,000; Project Length: 0.876 miles.
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />NW 87th Avenue, Miami-Dade County, Florida – Florida Department of
<br />Transportation (FDOT), District 6
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />2019
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Roadway Designer: She assisted with roadway design and was responsible for quantities. The scope of services for this project includes
<br />Roadway/Traffic Control Plan (TCP) design, pavement marking and signing, signalization, lighting, drainage and permitting, bridge construction,
<br />utility coordination, traffic study, traffic counts, traffic projections, and traffic warrants services.
<br />Project No.: 405615-3-52-01 Project Length: 1.90 miles; Cost/Fees Paid: $2,994,823.00; Construction Cost: $34,800,000 (Estimated)
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />SR-5/US-1/Biscayne Boulevard Resurfacing from NE 199th Street to NW 213th
<br />Street, Miami-Dade County, Florida – FDOT, District 6
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Designer responsible for the production of the roadway plans. The scope of services includes milling and resurfacing, signing and
<br />pavement markings, traffic control plans and ADA and pedestrian features upgrades. Project Length: 1.2 miles Project No.: 414624-3-32-01;
<br />Cost/Fees Paid: $228,638; Construction Cost: $3,520,907.11
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Design/Build for the Reconstruction of SE 3rd Street, Belle Glade, Florida – FDOT,
<br />District 4
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2010
<br />CONSTRUCTION (If applicable)
<br />2013
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Designer: She was responsible for the production of roadway plans, signing and pavement marking plans and quantities. The scope of
<br />this project included roadway plans, drainage design, signing and marking plans and utility relocation pl ans. The design included the use of filter
<br />fabric and a thick sub-base in lieu of demucking the roadway.
<br />Project No.: 426482-1-52-01 Project Start: 1/15/2010 Project Complete: 9/30/2013 Project Length: 0.3 miles.
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />
<br />Section E - Page | 32
|