Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br /> <br />12. NAME <br />ANGEL MARINEZ <br /> <br /> 13. ROLE IN THIS CONTRACT <br />Engineer Designer / Roadway Improvements, <br />Streetscape, Sidewalks, Parking, Pavement <br />Evaluation, SP&M <br /> <br /> 14. YEARS EXPERIENCE <br /> <br /> a. TOTAL <br />1 <br /> <br /> b. WITH CURRENT FIRM <br />1 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />R.J. BEHAR & COMPANY, INC. <br />6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br /> <br /> <br /> <br /> <br />16. EDUCATION (Degree and Specialization) <br />B.S. in Engineering, Florida Atlantic University, August 2019 <br /> <br /> 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br /> <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Marinez is a young engineer currently working in design and plans preparation for miscellaneous civil engineering projects. He <br />has experience with inspection. He is proficient in Microsoft Project, AutoCAD Civil3D, and Microstation. <br /> <br />19. RELEVANT PROJECTS <br /> <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />SR 25/Okeechobee Road from W. 7th Avenue to NW 36th Street, Miami-Dade <br />County, Florida – Florida Department of Transportation (FDOT), District 6 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />2020 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Designer for the milling and resurfacing, intersection island modifications and removals, upgrading pedestrian facilities to comply with ADA <br />requirements, guardrail upgrades, signalization improvements, new signing and pavement markings, and bridge railing upgrades. The project <br />scope also includes the addition of paved shoulders along both sides and culvert relocation at Frontage Road. Project Length: 1.05 miles <br />FPID: 425979-2-52-01; Cost/Fees Paid: $524,942.00; Construction Cost: 1,680,000.00. <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />I-95 at 6th Avenue Final Design, Palm Beach County, Florida – FDOT District 4 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Designer who is assisting with the plans preparation for interchange improvements, which includes a Level IV CAP, six typical sections, <br />pavement design, access management, TCP plans, temporary lighting on all ramps, drainage, utility coordination, Environmental Permits, signing <br />and marking plans, signalization and complete management of all subconsultants. The project also includes milling and resurfacing, adding bike <br />lines, upgrading roadway signs and curb ramps to meet the current ADA standards, adding exclusive right turn lanes, and modifications to existing <br />CSX tracks and overhead railroad structure. <br />Project #: 436963-1-32-01; Cost/Fees Paid: $750,000.00; Construction Cost: $TBD; Project Length: Interchange. <br />c. <br /> <br />(1) TITLE AND LOCATION (City and State) <br />NW 102nd Avenue from NW 138th Street to NW 142nd Street, Miami-Dade County, <br />Florida – City of Hialeah <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2020 <br /> <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Designer who is assisting with the plans preparation for the roadway reconstruction, one signal modification, a new drainage system, <br />lighting, utility coordination, signing and pavement marking, and permitting. <br />Cost/Fees Paid: $108,206.00; Construction Cost: $1,146,340.00; Project Length: 0.269 Miles <br /> <br />d. <br /> <br />(1) TITLE AND LOCATION (City and State) <br />SW 136th Street from US-1 to Old Cutler Road, Miami-Dade County, Florida – <br />Village of Palmetto Bay <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2020 <br /> <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Designer: He prepared the roadway design and geometrics, pavement signing and markings, assisted with the quantities for the asphalt. <br />He quantified the impervious and pervious areas for post and predevelopment. The project involves roadway plans, pavement marking and <br />signing plans, utility coordination, drainage design and permitting. The improvements will require milling and resurfacing of the existing roadway <br />and pavement widening to accommodate an on-road dedicated bicycle lane. The primary challenge for this project is accommodating the <br />proposed sidewalks and bicycle lanes in a right-of-way constrained corridor. <br />Cost/Fees Paid: $193,171.00; Construction Cost: $1,700,345.00 (Estimated); Project Length: 1.75 Miles. <br />e. <br /> <br />(1) TITLE AND LOCATION (City and State) <br />Cypress Weir (GOLD4A) Relocation Design, Palm Beach County, Florida – SFWMD <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br /> <br />CONSTRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Designer who is assisting with the plans preparation for a new project will include the construction of a new locally and remotely operated water <br />control structure in the new alignment of Cypress Canal, approximately 2000 ft east of the existing weir. <br />Cost/Fees Paid: $366,700; Construction Cost: $3,200,000 (Estimated) <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />Section E - Page | 31