Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />XAMARAH SEDA-VELEZ, MS <br /> <br /> 13. ROLE IN THIS CONTRACT <br />Roadway, Streetscape, Sidewalks, Parking, <br />Pavement Evaluation & Repairs, SP&M; <br />Utilities; Civil, Parks, Drainage, Stormwater, <br />Pumps, Water & Sewer <br /> <br /> <br /> 14. YEARS EXPERIENCE <br /> <br /> a. TOTAL <br />3 <br /> <br /> b. WITH CURRENT FIRM <br />2 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />R.J. BEHAR & COMPANY, INC. <br />6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br />16. EDUCATION (Degree and Specialization) <br />M.S. Engineering Management, Polytechnic University of Puerto Rico, 2018 <br />B.S. Civil Engineering, University of Puerto Rico, Mayagüez, 2015 <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br /> <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Ms. Seda-Velez is a young engineer currently working in design and plans preparation for miscellaneous civil engineering projects . She has <br />experience with inspection and evaluation of structures. She is proficient in Microsoft Office Suite, Microsoft Project, AutoCAD Civil3D, Sketchup, <br />Synchro, Primavera, VBA, Minitab17 and SAP2000. <br /> <br /> <br /> <br />1 9. RELEVANT PROJECTS <br /> <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Charles Avenue from Main Highway to South Douglas Road, Miami-Dade <br />County, Florida – City of Miami <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Designer: She assisted with plans preparation, drainage design plans and calculations. Scope of services includes project management, <br />investigation, roadway analysis and plans, signing and pavement marking, permitting, utility coordination, and civil engineering services <br />necessary for roadway and drainage improvements. Project #: B-183612 Project Length: 0.542 miles <br />Cost/Fees Paid: $93,396.21; Construction Cost: $1,029,528.51 (Estimate). <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />SW 34 Avenue and SW 28 Street Intersection Improvements Project, Miami- <br />Dade County, Florida – City of Miami <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Designer: She is assisting with plans preparation, drainage design plans and calculations. The project scope of services includes <br />roadway milling and resurfacing, localized drainage improvements, ADA ramps where applicable, new sidewalk where required and new <br />signing and pavement markings, utility coordination, and environmental permitting. Project #: B-173611; Project Length: 0.118 miles <br />Cost/Fees Paid: $33,088.95; Construction Cost:$162,784.17 (Estimated) <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />SW 35th Avenue from SW 29th Street to SW 28th Street Roadway Improvements <br />Project, Miami-Dade County, Florida – City of Miami <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Designer: She is assisting with plans preparation, drainage design plans and calculations. The project scope of services included <br />roadway milling and resurfacing, localized drainage improvements, ADA ramps where applicable, new sidewalk where required and ne w <br />signing and pavement markings, utility coordination, and environmental permitting. Project #: B173610; Project Length: 0.117 Miles <br />Cost/Fees Paid: $40,908.00; Construction Cost: $216,142.20 (Estimate). <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />NW 21st Court from NW 36th Street to NW 38th Street Roadway Improvements <br />Project, Miami-Dade County, Florida – City of Miami <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Designer: She assisted with plans preparation, drainage design plans and calculations. The project scope of services include d roadway <br />milling and resurfacing, localized drainage improvements, replacement of damaged sidewalks and driveway approaches, ADA ramps where <br />applicable, new sidewalk where required and new signing & pavement markings, utility coordination, environmental permitting. <br />Project #: B-50113; Project Length: 0.014 miles; Cost/Fees Paid: $33,894.15; Construction Cost: $300,401.64 (Estimate) <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />NW 102nd Avenue from NW 138th Street to NW 142nd Street, Miami-Dade County <br />– City of Hialeah, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Designer. She is responsible for drainage design plans, signing and pavement marking plans, and cross sections. The scope of services <br />for the improvements includes roadway plans, signing and pavement marking plans, drainage report and estimates of probable of construction <br />cost. Cost/Fees Paid: $108,206.00; Construction Cost: $1,146,340; Project Length: 0.269 Miles. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />Section E - Page | 30