|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />ALEJANDRO MEDINA
<br />
<br /> 13. ROLE IN THIS CONTRACT
<br />Senior Inspector/Construction
<br />Administration Services and Inspections
<br />
<br /> 14. YEARS EXPERIENCE
<br /> a. TOTAL
<br />35
<br />
<br /> b. WITH CURRENT FIRM
<br />3
<br />15. FIRM NAME AND LOCATION (City and State)
<br />R.J. BEHAR & COMPANY, INC.
<br />6861 SW 196th Avenue, Suite 302
<br />Pembroke Pines, FL 33332
<br />16. EDUCATION (Degree and Specialization)
<br />▪ Degree in Engineering Public Works Constructions, Technical
<br />University of Madrid, Spain, Sept 2007
<br />▪ Degree in Civil Engineer, IPJAE, Cuba, June 1981
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />CERTIFICATIONS: TIN #: M352010561001
<br />Advanced Maintenance of Traffic, Asphalt Paving I & II, Earthwork I & II, Drilled Shaft, FDOT Concrete Level I, ACI Concrete Field
<br />Technician, FDOT Critical Structures, APNGA Portable Nuclear Gauge Safety & Hazmat Certification, IMSA Traffic Signal
<br />Technician I
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Seawall Design at Tobie Wilson Park, Miami-Dade County, Florida – Town of
<br />Medley
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />
<br />CONSTRUCTION (If applicable)
<br />2020
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Senior Inspector who assisted with the construction inspection of the seawall. The scope of work will include construction of approximately 850
<br />feet of a new bulkhead wall located along the south bank of the Miami Canal. Project Length: 850’
<br />Cost/Fees Paid: $112,000; Construction Cost: $1,394,664
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Landscape Median Project CEI Services, Broward County, Florida – City of
<br />Tamarac
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />
<br />CONSTRUCTION (If applicable)
<br />2019
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Senior Inspector in charge of overseeing the construction of the landscape project. He was responsible for producing daily r eports, attending
<br />meetings, verifying that the Contractor was building the project according to the correct specifications. The scope included additional tree
<br />planting, removal of old irrigation and replacement with new irrigation. Cost/Fees Paid: $52,976.00 Construction Cost: $391,591.37
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Pump Stations D-10 and D-11 Construction Inspection, Broward County,
<br />Florida – City of Ft. Lauderdale
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />
<br />CONSTRUCTION (If applicable)
<br />2019
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Senior Inspector: He was responsible for overseeing the Contractors work, maintained accurate daily records, monitored the Maintenance of
<br />Traffic (MOT), prepared a punchlist and provided it to the City, verified substantial completion and that the project was built satisfactorily,
<br />provided all reports and deliverables. This project consisted of rehabilitating the City of Fort Lauderdale’s sewage pumping Stations D-10 and
<br />D-11 and associated wastewater system components. The work consisted of demolishing and removing existing structures, piping and
<br />equipment; cleaning, rehabilitating, and painting existing structures; construction of new gravity sanitary sewers, manhole and a valve vault;
<br />installation of new submersible sewage pumps, piping, appurtenances; electrical and control systems; and all restoration. Project Length: N/A
<br />Project #. 12202; Cost/Fees: $ 113,692.46; Construction Cost: $1.5 million.
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Wiles Road from West of Rock Island Road to SR-7/US-441, Broward County,
<br />Florida – Broward County Highway Construction & Engineering
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />
<br />CONSTRUCTION (If applicable)
<br />2019
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Roadway Inspector. He started on the project on 10/2018 to assist with the final inspections and close out of the proj ect. He was responsible
<br />for daily inspections; daily inspections of MOT lane closures and MOT devices; documenting field changes from utility conflicts; conducting
<br />routine daily field inspections of overall work progress throughout project limits; and per forming daily inspections of erosion control devices.
<br />Cost/Fees Paid: $1,066,478.77 Construction Cost: $10,632,710.79
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Miami Dade County Drainage Projects, Miami-Dade County, Florida – Miami-
<br />Dade County Department of Transportation and Public Works
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />
<br />CONSTRUCTION (If applicable)
<br />2017
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Construction Inspector responsible for maintaining complete and accurate records of all activities and events related to the project; keeping the
<br />daily project journal, including maintaining accurate records of the contractor's operations, quantities installed, sampling and testing data,
<br />project photo and video documentation; properly documenting all significant Project changes; interpreting plans, specifications, and construction
<br />contract provisions; reviewing and keeping project as-builts current and up to date, making recommendations to the County to resolve disputes;
<br />and assisting with the project closeout. Varied; Cost/Fees Paid: $200,000; Construction Cost: $2,000,000 (Estimated).
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />Section E - Page | 34
|