Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />ALEJANDRO MEDINA <br /> <br /> 13. ROLE IN THIS CONTRACT <br />Senior Inspector/Construction <br />Administration Services and Inspections <br /> <br /> 14. YEARS EXPERIENCE <br /> a. TOTAL <br />35 <br /> <br /> b. WITH CURRENT FIRM <br />3 <br />15. FIRM NAME AND LOCATION (City and State) <br />R.J. BEHAR & COMPANY, INC. <br />6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br />16. EDUCATION (Degree and Specialization) <br />▪ Degree in Engineering Public Works Constructions, Technical <br />University of Madrid, Spain, Sept 2007 <br />▪ Degree in Civil Engineer, IPJAE, Cuba, June 1981 <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br /> <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />CERTIFICATIONS: TIN #: M352010561001 <br />Advanced Maintenance of Traffic, Asphalt Paving I & II, Earthwork I & II, Drilled Shaft, FDOT Concrete Level I, ACI Concrete Field <br />Technician, FDOT Critical Structures, APNGA Portable Nuclear Gauge Safety & Hazmat Certification, IMSA Traffic Signal <br />Technician I <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Seawall Design at Tobie Wilson Park, Miami-Dade County, Florida – Town of <br />Medley <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION (If applicable) <br />2020 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Senior Inspector who assisted with the construction inspection of the seawall. The scope of work will include construction of approximately 850 <br />feet of a new bulkhead wall located along the south bank of the Miami Canal. Project Length: 850’ <br />Cost/Fees Paid: $112,000; Construction Cost: $1,394,664 <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Landscape Median Project CEI Services, Broward County, Florida – City of <br />Tamarac <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Senior Inspector in charge of overseeing the construction of the landscape project. He was responsible for producing daily r eports, attending <br />meetings, verifying that the Contractor was building the project according to the correct specifications. The scope included additional tree <br />planting, removal of old irrigation and replacement with new irrigation. Cost/Fees Paid: $52,976.00 Construction Cost: $391,591.37 <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Pump Stations D-10 and D-11 Construction Inspection, Broward County, <br />Florida – City of Ft. Lauderdale <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Senior Inspector: He was responsible for overseeing the Contractors work, maintained accurate daily records, monitored the Maintenance of <br />Traffic (MOT), prepared a punchlist and provided it to the City, verified substantial completion and that the project was built satisfactorily, <br />provided all reports and deliverables. This project consisted of rehabilitating the City of Fort Lauderdale’s sewage pumping Stations D-10 and <br />D-11 and associated wastewater system components. The work consisted of demolishing and removing existing structures, piping and <br />equipment; cleaning, rehabilitating, and painting existing structures; construction of new gravity sanitary sewers, manhole and a valve vault; <br />installation of new submersible sewage pumps, piping, appurtenances; electrical and control systems; and all restoration. Project Length: N/A <br />Project #. 12202; Cost/Fees: $ 113,692.46; Construction Cost: $1.5 million. <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Wiles Road from West of Rock Island Road to SR-7/US-441, Broward County, <br />Florida – Broward County Highway Construction & Engineering <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Roadway Inspector. He started on the project on 10/2018 to assist with the final inspections and close out of the proj ect. He was responsible <br />for daily inspections; daily inspections of MOT lane closures and MOT devices; documenting field changes from utility conflicts; conducting <br />routine daily field inspections of overall work progress throughout project limits; and per forming daily inspections of erosion control devices. <br />Cost/Fees Paid: $1,066,478.77 Construction Cost: $10,632,710.79 <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Miami Dade County Drainage Projects, Miami-Dade County, Florida – Miami- <br />Dade County Department of Transportation and Public Works <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION (If applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Construction Inspector responsible for maintaining complete and accurate records of all activities and events related to the project; keeping the <br />daily project journal, including maintaining accurate records of the contractor's operations, quantities installed, sampling and testing data, <br />project photo and video documentation; properly documenting all significant Project changes; interpreting plans, specifications, and construction <br />contract provisions; reviewing and keeping project as-builts current and up to date, making recommendations to the County to resolve disputes; <br />and assisting with the project closeout. Varied; Cost/Fees Paid: $200,000; Construction Cost: $2,000,000 (Estimated). <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />Section E - Page | 34