Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />LOGAN FASANELLA <br /> <br /> 13. ROLE IN THIS CONTRACT <br />Construction Senior Inspector, <br />Traffic Data <br /> <br /> 14. YEARS EXPERIENCE <br /> a. TOTAL <br />8 <br /> <br /> b. WITH CURRENT FIRM <br />6 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />R.J. BEHAR & COMPANY, INC. <br />6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br />16. EDUCATION (Degree and Specialization) <br />A.A. Culinary, Art Institute of Tampa, Tampa, Florida <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />TIN #: F254533883350 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />CERTIFICATIONS: Advanced Maintenance of Traffic; Earthwork Construction Inspection I & II; Asphalt Paving Technician Level I & II; FDOT <br />Critical Structures Construction Issues; FDOT Concrete Field Technician Level 1; Pile Driving; Drilled Shaft Inspector; Storm water Erosion <br />Sedimentation Control Inspector; Final Estimates Level I & II; Hazmat/Nuclear Radiation; FDOT MSE Walls Certification; FDOT Wage and Labor <br />Training; CSX Roadway Worker Protection; MAC Computer-Based Training, IMSA Traffic Signal Inspector Level I, IMSA Traffic Signal <br />Technician Level I, Post Tensioning/Grouting – Scheduled 3/2020 <br />19. RELEVANT PROJECTS <br /> <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Nova Drive Construction Engineering and Inspection (CEI) Services, Broward <br />County, Florida – Town of Davie <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION (If applicable) <br />2020 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Senior Inspector responsible for overseeing the MOT schemes and devices in work zones; monitoring the Contractor’s work and assuring that <br />the Contractor is conducting inspections, preparing reports, and monitoring all stormwater pollution prevention measures associated with the <br />project; reviewing and monitoring compliance with drawings, contract documents, and technical specifications; maintaining complete and <br />accurate records of all activities and events relating to the Project; properly documenting all significant Project changes; inter preting plans, <br />specifications, and construction contract provisions; and maintaining an adequate level of surveillance of the Contractor’s activities. Project <br />Length: 1.29 miles; Project #: B-17-151; Cost/Fees Paid: $496,280; Construction Cost: $6,425,430 <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Davie Road Phase II Local Agency Program (LAP) CEI Services, Town of <br />Davie/Florida Department of Transportation (FDOT), District 4/Broward County <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION (If applicable) <br />2018 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Senior Inspector who performed daily inspections, produced weekly reports, monitored the contractor’s pay items, attended progress meetings, <br />monitored shop drawings and RFIs, performed Temporary Traffic Control Plan Reviews including the coordination of lane closures, and <br />conducted the material sample reviews. Cost/Fees Paid: $297,438.25 - Construction Cost: $2,433,873.04 Project Length: 0.89 miles. <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Miami Dade County Drainage Projects, Miami-Dade County, Florida – Miami- <br />Dade County Department of Transportation and Public Works <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION (If applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Construction Inspector responsible for maintaining complete and accurate records of all activities and events related to the project; keeping the <br />daily project journals, including maintaining accurate records of the contractor's operations, quantities installed, sampling and testing data, <br />project photo and video documentation; review of Work Zone traffic control plan design, implementation, and inspection of maintenance of <br />traffic schemes and devices in work zones to assure they are in accordance with the C ounty’s requirements; properly documenting all <br />significant Project changes; interpreting plans, specifications, and construction contract provisions; reviewing and keeping project as-builts <br />current and up to date, making recommendations to the County to resolve disputes; and assisting with the project closeout. Project #: Varies; <br />Cost/Fees Paid: $200,000; Construction Cost: $2,000,000 (Estimated). <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />SW 212th Street Drainage LAP Project CEI, Miami-Dade County, Florida – Town <br />of Cutler Bay <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION (If applicable) <br />2015 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Inspector who performed inspections to verify that all punch list items were resolved. The work included milling and resurfacing, new curb and <br />gutters, ADA compliant curb ramps, signing, and pavement markings, replacement of damaged sidewalk flags, and the installation of a solar- <br />powered pedestrian beacon rapid-flashing. FM #: 436608-1-52-01; Project Length: 0.34 miles <br />Cost/Fees Paid: $70,514.80; Construction Cost: $727,590.87. <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Design Services for SR-710/Beeline Highway, Palm Beach County, Florida – <br />FDOT, District 4 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Traffic Data Collector – He performed traffic counts and data collection. This project included 24 hour and turning movement counts. <br />Project Length: 3.142 miles; Project #: 419251-1-32-01 Cost/Fees Paid: $572,400.00 Construction Cost: $66.4 Million (Estimate) <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />Section E - Page | 35