My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. BEHAR & CO.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
R.J. BEHAR & CO.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 11:25:35 AM
Creation date
8/24/2020 11:23:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />1 <br />21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED <br />SW 136TH STREET FROM US-1 TO OLD CUTLER ROAD - LAP <br />VILLAGE OF PALMETTO BAY, FLORIDA <br />PROFESSIONAL SERVICES <br />2020 <br /> CONSTRUCTION (If applicable) <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />Village of Palmetto Bay <br />9705 East Hibiscus Street <br />Palmetto Bay, Florida 33157 <br />b. POINT OF CONTACT NAME <br />Mr. Dionisio Torres <br />Director, Public Works <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />Tel: 305-969-5011 <br />Email: dtorres@palmettobay-fl.gov <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />R.J. Behar & Company, Inc. (RJ Behar) was contracted by the Village of Palmetto Bay to provide professional engineering services <br />for the construction of roadway improvement project and on-road dedicated bicycle lanes along SW 136th Street from US-1 to Cutler <br />Road. <br />This is a Local Agency Program (LAP) Agreement project between Miami -Dade County, the Village of Palmetto Bay, the Village of <br />Pine Crest and the Florida Department of Transportation. <br />The project involves roadway plans, pavement marking and signing plans, utility coordination, drainage design and, permitting. The <br />improvements will require milling and resurfacing the existing roadway and pavement widening to accommodate an on-road <br />dedicated bicycle lane. The primary challenge for this project was a ccommodating the proposed sidewalks and bicycle lanes in a <br />right of way constrained corridor. <br />Cost/Fees Paid: $193,171.00 Construction Cost: $1,700,345.00 (Estimated) Project Length: 1.75 Miles <br />Key Personnel: Robert J. Behar, PE - Principal in Charge Carlos Mazorra, PE – Project Manager | Paola Riveros, PE – Project <br />Engineer | Kira Leon, PE – Project Engineer | Hector Rosario, EI – Project Engineer | Elmer Cardenas, PE – Project Engineer | <br />Joyce Ledan, EI – Project Designer | Angel Marinez – Project Designer | Jaime Delgado – Utility Coordinator. <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1)FIRM NAME <br />R.J. BEHAR & COMPANY, INC. <br />(2)FIRM LOCATION (City and State) <br />6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br />(3) ROLE <br />Project management, site visits, signing and <br />pavement markings, <br />utility coordination. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 1 <br />Section E - Page | 37
The URL can be used to link to this page
Your browser does not support the video tag.