Laserfiche WebLink
Flood 10/31/2011 <br /> F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> 20. EXAMPLE PROJECT KEY <br /> NUMBER <br />4 <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />LYONS PARK NEIGHBORHOOD IMPROVEMENT PROJECT <br />CITY OF POMPANO BEACH, FLORIDA <br /> PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER City of Pompano Beach <br />Engineering Division <br />1201 NE 5th Avenue <br />Pompano Beach, FL 33060 <br />b. POINT OF CONTACT NAME Mr. John Sfiropoulos, PE <br />City Engineer <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER Tel: (954) 545-7009 <br />Email: John.Sfiropoulos@copbfl.com <br /> <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />The Lyons Park Neighborhood is located west of <br />South Cypress Road, north of McNab Road, east of <br />South Flagler Avenue and south of Southwest 8th <br />Street. The area is served by an existing stormwater <br />collection system. The existing stormwater <br />management system consists of four independent <br />systems, which discharge to systems outside of the <br />neighborhood. The ultimate outfalls are located to the <br />south of West McNab Road and to the east of South <br />Cypress Road. The project area suffers from flooding <br />problems as documented in the City Stormwater <br />Master Plan (SWMP). This project intends to improve the <br />drainage systems within the project area. <br /> The sanitary sewer lines within the Lyons Park <br />Neighborhood are located in the rear yard easements of <br />the properties/homes. One of the City of Pompano <br />Beach’s Comprehensive Plan policies is to identify the <br />feasibility of implementing capital projects to relocate the <br />sewer lines or to rehabilitate them in place. This project <br />includes the design for the relocation of the sewers to the street’s right-of-way and new lateral <br />services. The project also includes design of water line relocations in areas where there are conflicts with other improvements. <br /> As part of the project all the streets will be reconstructed, with new pavement markings, and completely new stormsewer system, <br />sanitary sewer system, and regraded swales. The design included structural design of seawall repairs for new outfalls. An <br />extensive public outreach effort was conducted including presentations, workshops and one-on-one meetings. Also included was <br />the coordination and preparation of Right-of-way sketches for required easements. <br />Cost/Fees Paid: $410,000.00 | Construction Cost: $10,800,000 (Estimate) <br />Key Personnel: Juan H. Vazquez, PE, PH, BCEE – Principal in Charge/Project Manager │Hans Murzi, PE – Assistant Project <br />Manager │Elmer Cardenas, PE, CEI – Project Engineer │Paola Riveros, PE – Project Engineer │ Kira Leon, EI – Project Engineer <br />│Noel Flores, EI – Structural Engineer │Sugeily Patxot – Designer │Joseph Edwards, EI – Project Engineer. <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> a. <br /> (1) FIRM NAME <br />R.J. BEHAR & COMPANY, INC. <br /> (2) FIRM LOCATION (City and State) <br />6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br /> (3) ROLE <br />Stormwater design, sanitary sewer design of the <br />wastewater collection system, design of proposed <br />water improvements, utility coordination, <br />permitting, and cost estimating. <br />b. <br /> (1) FIRM NAME <br /> <br /> (2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />Section E - Page | 40