My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. BEHAR & CO.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
R.J. BEHAR & CO.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 11:25:35 AM
Creation date
8/24/2020 11:23:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD FORM 330 (REV. 8/2016) <br /> <br /> <br /> <br /> <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br /> 5 <br /> <br />21. TITLE AND LOCATION (City and State) <br />SW 42 Street (Bird Road Extension) From SW 162 Avenue to SW 157 Avenue, <br />Miami-Dade County, Florida <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br /> <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER <br />Miami- Dade Public Works and Waste <br />Management c/o David Plummer & <br />Associates, Inc. <br />b. POINT OF CONTACT NAME <br />Mr. Victor Lee <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(305)-447-0900 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />TSF provided Geotechnical Engineering Services for the widening project of Bird Road Extension from SW 162 nd Ave to SW 15th Avenue in <br />Miami-Dade County. <br /> <br />The roadway limits are approximately 3,100 lineal feet in length. The study was performed to obtain information on the existing subsurface <br />conditions along the project alignment to assist in the design and preparation of construction plans for improvements. <br /> <br />TSF’s geotechnical field study included SPT borings. <br /> <br />Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding permanent cut and fill slopes, <br />excavations, groundwater control, pavement design considerations, and on-site suitability. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br />TSF <br /> <br />(2) FIRM LOCATION (City and State) <br />West Palm Beach, FL <br />(3) ROLE <br />Geotechnical Engineering Services <br /> <br />Section E - Page | 59
The URL can be used to link to this page
Your browser does not support the video tag.