|
STANDARD FORM 330 (REV. 8/2016)
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Surveys in Puerto Rico, USVI and Florida; US Corps of Engineers
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />In progress
<br />CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />From January 2001 to 2012, and from 2019 to present he has served as Project Manager and Principal in charge for contracts with the
<br />Jacksonville District Corps of Engineers to perform hydrographic, topographic, cadastral and construction surveys in Puerto Rico, Florida
<br />and the US Virgin Islands. Over 40 delivery orders have been completed with a cumulative cost of more than 4M.
<br />His role on these projects is as Project Manager and Principal in charge.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Topographic, Hydrographic and ALTA/NSPS Boundary Survey, Multiple
<br />Municipalities, Lower La Plata, Puerto Rico
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2020 CONSTRUCTION (If applicable)
<br />((3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />This project demands experienced land surveying support for the study of the Lower La Plata River. The study includes a Topog raphic
<br />Survey, Dual Frequency Hydrographic Survey, Title Commitment study and Boundary Survey of over 100 adjacent properties. The value
<br />of this project was $477,000. His role in the project was as Project Manager and Principal in charge.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Topographic and Hydrographic Survey Support Services for South Florida
<br />Water Management District C-139 Flow Equalization Basin (FEB) Project;
<br />Hendry County, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2020
<br />CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Ground topographic information for LiDAR verification, recovery and establishment of survey control on the project area and the
<br />existing conditions survey of various structures, proposed access and/or proposed embankments within the project limits, as
<br />supplemental data to support the project development and augment previous surveys performed by others. The cost of these project was
<br />$207,000. His role in the project was as Project Manager and Principal in charge.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Via Verde Pipeline Project, Various Municipalities in Puerto Rico
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2011
<br />CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Topographic Survey and Plans and Specifications for Natural Gas Pipeline from Peñuelas to Cambalache and Cambalache to San Ju an,
<br />PR. The purpose of this survey was to serve as a route selection tool and as the base plans and specifications survey to be utilized for
<br />engineering design. The total alignment length was approximately 93 miles of which JEBA was responsible for hydrographic surv eys, and
<br />38 segments of pipelines. The value of this project was $568,000.00. His role in this project was Project Manager and Principal in charge.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Herbert Hoover Dike (HHD) Various Survey Projects in Okeechobee, South
<br />Florida under an ID/IQ contract with the USACE.
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2010 CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Survey 09-140 – Herbert Hoover Dike Piezometers Topographic Survey at Palm Beach County, FL. The firm was the prime land
<br />surveying services consultant for the Herbert Hoover Dike Piezometers Topographic Survey (Reach 1, 3 and 7), Palm Beach County, FL.
<br />The Cost of this project was $152,451.
<br />Surveys 09-131 & 09-132 – Herbert Hoover Dike Land Side Survey at Palm Beach, Hendry and Glades County, FL . Firm was the
<br />prime land surveying services consultant for the Landside Topographic Survey of Reach 2 and 3 of the HHD Project, Palm Beach,
<br />Hendry and Glades County. The cost of this project was $ 415,822.
<br />Survey 09-159- Herbert Hoover Dike Lidar Project: The firm was the prime land surveying services consultant for the Herbert
<br />Hoover Dike Northwest Shore Aerial Photography and LIDAR Survey – Highland, Glades, and Okeechobee County, FL The cost of this
<br />project was $767,623.
<br />As the prime land surveying consultant, the firm was in charge of managing the project and complying with project deliverables. The
<br />firm also executed field data acquisition with its own equipment and in-house personnel, data processing, quality assurance, cartographic
<br />mapping and deliverable formatting and submittal.
<br />His role in this project was as Project Manager and Principal in charge.
<br />Section E - Page | 64
|