|
STANDARD FORM 330 (REV. 8/2016)
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />12. NAME Carlos Lebrón Cabrera 13. ROLE IN THIS CONTRACT
<br />Survey Manager
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />12
<br />b. WITH CURRENT FIRM
<br />9
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Javier E Bidot & Associates, PSC, Corp Boca Raton, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />BS/2008/Land Surveying and Mapping
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Puerto Rico/PSM License #23744, Florida/PSM License # LS7259
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Active Member of PR Engineers and Land Surveyors Association and the Florida Surveying and Mapping Society. Mr. Lebrón
<br />oversees the survey operation, supporting technical staff and subconsultants including and not limited to High Definition
<br />Surveys, ALTA/NSPS Surveys, Topographic Surveys, Subsurface Utility Surveys and Hydrographic Surveys, Horizontal and
<br />Vertical Control Network and Right of Ways Plans. He performs quality control of all survey documents, including survey
<br />plans, record plats, descriptions, and review of title commitments reports. Mr. Lebrón is U.T.A. Certified Advanced Professional
<br />Utility Locator and FAA Unmanned Aerial Systems Certified Pilot (Part 107).
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Topographic and Hydrographic Survey Support Services for South Florida Water
<br />Management District C-139 Flow Equalization Basin (FEB) Project; Hendry
<br />County, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2020
<br />CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Ground topographic information for LiDAR verification, recovery and establishment of survey control on the project area and t he existing
<br />conditions survey of various structures, proposed access and/or proposed embankments within the project limits, as supp lemental data to
<br />support the project development and augment previous surveys performed by others. The cost of this project was $207,000. His role in this
<br />project was Survey Manager.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Broward County Schools Capital Improvements Program, Broward County, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2020
<br />CONSTRUCTION (If applicable)
<br />((3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />The work consisted of existing conditions, topographic and utility location, and identification (including GPR/SUE) surveys for capital
<br />improvement projects that included perimeter security, fire protection and site utilities. As the prime land surveying c onsultant, the firm
<br />was in charge of managing the project and complying with deliverables. The total cost of these projects was over $50,000. His role in the
<br />project was as Survey Manager.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Topographic, Existing Conditions and High Definition Surveys for 15 Virgin
<br />Islands Port Authority (VIPA) facilities in St. Thomas, St. John and St. Croix
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Perform the topographic, existing conditions and high definition surveys for VIPA facilities. Deliverables for this project included
<br />AutoDesk Revit models and AutoCad-based topographic and existing condition surveys. The cost of this project was $112,500. His role
<br />in this project was as Survey Manager.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Mahogany Road Reconstruction Project, St. Croix, USVI
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />The scope of this project was to perform the Topographic and Existing Conditions Survey for Mahogany Road, St Croix. As part of the
<br />reconstruction efforts of the Hurricane Maria and Irma, JEBA was retained for the survey of a two-lane road segment of approximately
<br />5.75 miles. The cost of this project was $118,000. His role in this project was as Survey Manager.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Santa Isabel Wind Project, Santa Isabel, PR
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016 CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />The work included, among other tasks, the ALTA/ACSM boundary surveys for a group of real estate parcels with an estimated are a of
<br />6,000 acres to be made part of a wind farm. An aerial mapping task, for an area of 10,000 acres was also executed by firm to expedite the
<br />mapping of the surveyed parcels and other outlying areas of interest. The total cumulative cost of this project was $470,205. His role in the
<br />project was as Mapping Technician/Survey Manager.
<br />Section E - Page | 65
|