My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Synalovski Romanik Saye LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Synalovski Romanik Saye LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 11:34:48 AM
Creation date
8/24/2020 11:32:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22 <br />PRICE. SRS will assist the City of Sunny Isles Beach during the bidding of the project. We will work with the City <br />on determining the best value engineering and constructability options. We will shepherd the bid documents <br />that will be distributed, monitor the bid process, respond to any requests for information during the bidding, <br />analyze the bids received and provide the City of Sunny Isles Beach with the recommendation on the award of the <br />construction contract. <br />CONSTRUCT. Finally, we arrive at the construction administration phase of the project and our participation and <br />continued communication will be critical to the success of the building process. During the construction, we will <br />remain an active participant by attending the pre-construction conference and weekly construction progress <br />meetings and by performing the tasks identified below: <br />• Advise the City of Sunny Isles Beach on all aspects of the construction project. <br />• Monitor and Review of Shop Drawings and Submittals. <br />• Make periodic site visits to the project to observe the progress of all disciplines including any <br /> required threshold inspection and resolution of on-site issues. <br />• Assure that a high level of workmanship is maintained and achieved. <br />• Issue instructions to the CMAR, should any interpretations and clarifications be required for RFI’s. <br />• Review, evaluate and approve progress payments due based upon the progress of the work <br /> completed. Review construction schedules and critical path. <br />• Observe the initial operation of the building systems and confirm compliance with the <br /> specifications. <br />• Perform a final punch list and review all final as-built drawings. <br />• Report and establish final project completion, including recommending final payment at the <br /> appropriate time and retainage reduction, if appropriate. Get overseeing Department to Issue <br /> Certificate of Final Completion. Begin the warranty phase of the project. <br />• Shepherd the submittal of 100% Construction Documents, including Electronic Copies, to <br /> the City of Sunny Isles Beach. <br />CELEBRATE. Lastly, we will celebrate with Sunny Isles Beach at the (re) opening of municipal buildings/ facilities.. <br />With these added community benefits, the legacy of the project will live on for current and future residents to <br />enjoy for years to come. Synalovski Romanik Saye, LLC will execute each phase of the project by way of a single <br />point project manager delivery. Merrill Romanik, AIA, LEED AP, will shepherd the success of the project from start <br />to finish. The duration of each phase of the project will be directed by Merrill, who has managed every municipal <br />project completed by our Firm. Not a single Municipal or Private Project designed by SRS has been late or over <br />budget. Most of our projects have been awarded for both design and construction excellence.
The URL can be used to link to this page
Your browser does not support the video tag.