22 <br />PRICE. SRS will assist the City of Sunny Isles Beach during the bidding of the project. We will work with the City <br />on determining the best value engineering and constructability options. We will shepherd the bid documents <br />that will be distributed, monitor the bid process, respond to any requests for information during the bidding, <br />analyze the bids received and provide the City of Sunny Isles Beach with the recommendation on the award of the <br />construction contract. <br />CONSTRUCT. Finally, we arrive at the construction administration phase of the project and our participation and <br />continued communication will be critical to the success of the building process. During the construction, we will <br />remain an active participant by attending the pre-construction conference and weekly construction progress <br />meetings and by performing the tasks identified below: <br />•  Advise the City of Sunny Isles Beach on all aspects of the construction project. <br />•  Monitor and Review of Shop Drawings and Submittals. <br />•  Make periodic site visits to the project to observe the progress of all disciplines including any <br /> required threshold inspection and resolution of on-site issues. <br />•  Assure that a high level of workmanship is maintained and achieved. <br />•  Issue instructions to the CMAR, should any interpretations and clarifications be required for RFI’s. <br />•  Review, evaluate and approve progress payments due based upon the progress of the work <br /> completed. Review construction schedules and critical path. <br />•  Observe the initial operation of the building systems and confirm compliance with the <br /> specifications. <br />•  Perform a final punch list and review all final as-built drawings. <br />•  Report and establish final project completion, including recommending final payment at the <br /> appropriate time and retainage reduction, if appropriate. Get overseeing Department to Issue <br /> Certificate of Final Completion. Begin the warranty phase of the project. <br />•  Shepherd the submittal of 100% Construction Documents, including Electronic Copies, to <br /> the City of Sunny Isles Beach. <br />CELEBRATE. Lastly, we will celebrate with Sunny Isles Beach at the (re) opening of municipal buildings/ facilities.. <br />With these added community benefits, the legacy of the project will live on for current and future residents to <br />enjoy for years to come. Synalovski Romanik Saye, LLC will execute each phase of the project by way of a single <br />point project manager delivery. Merrill Romanik, AIA, LEED AP, will shepherd the success of the project from start <br />to finish. The duration of each phase of the project will be directed by Merrill, who has managed every municipal <br />project completed by our Firm. Not a single Municipal or Private Project designed by SRS has been late or over <br />budget. Most of our projects have been awarded for both design and construction excellence.