Laserfiche WebLink
38 <br />SUE <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12.NAME <br />Larisa Podolskaya, CST I <br />13.ROLE IN THIS CONTRACT <br />Survey | SUE Technician <br />14. YEARS EXPERIENCE <br />a.TOTAL <br />25 <br />b.WITH CURRENT FIRM <br />17 <br />15.FIRM NAME AND LOCATION (City and State) <br />Miller Legg, Fort Lauderdale, FL <br />16.EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Science / Electrical Engineering <br />17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />FL / Certified Survey Technician Level I <br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Ms. Podolskaya is a Senior Survey Technician who specializes in right-of-way surveying, boundary surveying and construction layout. She has worked on boundary, topographic, right-of-way, <br />engineering design, construction layout, and control surveys overseeing and assisting with numerous projects for the Florida Department of T ransportation, utilizing MicroStation. She also is <br />experienced in AutoCAD working with numerous government and private sector clien ts including municipalities and counties, as well as for educational facilities and health care clients, and private <br />developers. <br />19. RELEVANT PROJECTS <br />a. <br />(1)TITLE AND LOCATION (City and State) <br />City of Sunny Isles Beach Gwen Margolis Park and Pelican Community Park <br />Artificial Turf <br />Sunny Isles Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013 <br />CONSTRUCTION (If Applicable) <br />2013 <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br />Survey Technician: The project consisted of the reconstruction of existing natural turf fields at Pelican Community Park and Senator Gwen <br />Margolis Park in the City of Sunny Isles Beach with artificial turf. Miller Legg provided the preparation and permitting of drainage plans to <br />collect under the new drain systems installed as part of the project, as well as surveying services. In addition, constr uction observation was <br />provided to verify compliance with the plans and for the certification of the project through regulatory agencies. <br />b. <br />(1)TITLE AND LOCATION (City and State) <br />City of Miami West End Park Survey & SUE <br />Miami, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If Applicable) <br />N/A <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br />Senior Technician: Miller Legg provided boundary and topographic surveying services along with an underground utility survey of West <br />End Park in Miami. The 7-acre active park offers playground, swimming pool, baseball, tennis, pavilion and picnic facilities in addition to a <br />community center. <br />c. <br />(1)TITLE AND LOCATION (City and State) <br />City of Miami Beach Collins Park Parking Garage 2018 <br />Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If Applicable) <br />N/A <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br />Survey Technician: Miller Legg was a subconsultant to the KVC Constructors/Shulman + Associates Team (and previously the Zaha Hadid <br />Architects/Berenblum Busch Architects Team) providing property boundary and topographic surveying of the Collins Park Parking Garage, <br />as well as topographic surveys of Liberty Avenue from 21st to 23rd Streets. The project will include 513 parking spaces, 15,000 square <br />feet of ground floor retail, and a public plaza. Collins Park is at the southern end of South Beach, adjacent to the Bass Museum, Miami City <br />Ballet and Miami-Dade Regional Public Library, a neighborhood considered the cultural destination of Miami Beach. <br />d. <br />(1)TITLE AND LOCATION (City and State) <br />City of Homestead Campbell Drive/SW 312th Street & SW 144 Avenue <br />Crossing C-103-N Canal End <br />Homestead, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If Applicable) <br />N/A <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br />Survey Technician: Miller Legg provided a specific purpose topographic survey and civil engineering design services to the City for <br />emergency repairs of a guardrail located on the east side of the north parapet of FDOT Bridge No. 874353. The bridge is located on <br />Campbell Drive/SW 312th Street and crosses the C-103-N Canal. This project was designed through the City's Library of Consultants for <br />Architectural and Engineering services. <br />e. <br />(1)TITLE AND LOCATION (City and State) <br />Miami-Dade County Parks, Recreation & Open Space (PROS) Underline <br />Brickell Backyard SUE <br />Miami, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If Applicable) <br />N/A <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br />Survey Technician: Miller Legg provided underground utility designation and mapping services in preparation for the M-Path / Brickell <br />Backyard phase of The Underline project in Miami-Dade County. Utility designation is provided to prevent the likelihood of damage during <br />any excavation and/or provide design information. The development of the Underline seeks to transform the underutilized land below <br />Miami's Metrorail into a 10-mile neighborhood park, urban trail and living art destination; connecting communities as it creates a mobility <br />corridor that integrates transit, car, biking and walking. <br />STANDARD FORM 330 (1/2004)PAGE 2