|
37
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12.NAME
<br />Karen Lynch, PSM
<br />13.ROLE IN THIS CONTRACT
<br />Project Surveyor | SUE
<br />14. YEARS EXPERIENCE
<br />a.TOTAL
<br />43
<br />b.WITH CURRENT FIRM
<br />38
<br />15.FIRM NAME AND LOCATION (City and State)
<br />Miller Legg, Fort Lauderdale, FL
<br />16.EDUCATION (DEGREE AND SPECIALIZATION)
<br />Associates Degree / Liberal Arts
<br />17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />FL / Registered Professional Surveyor & Mapper
<br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Ms. Lynch has extensive South Florida survey project management experience in a number of different public sector environment s such as roadways and streetscapes, educational facilities, parks
<br />and recreation, and healthcare and medical office complexes. She also has wide-ranging experience in private sector surveying, including residential projects as well as commercial and industrial
<br />facilities.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1)TITLE AND LOCATION (City and State)
<br />Miami-Dade Co. Parks, Recreation & Open Spaces (PROS) Kendall Soccer
<br />Park Survey
<br />Kendall, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Project Surveyor: Miller Legg was selected to provide topographic survey services to Miami-Dade County for the purposes of showing
<br />above-ground improvements and tree locations for an artificial turf replacement project on five (5) soccer fields. The survey was designed
<br />to show rim and invert elevations, pipe and drainage structure sizes.
<br />b.
<br />(1)TITLE AND LOCATION (City and State)
<br />City of Miami West End Park Survey & SUE
<br />Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Project Surveyor Miller Legg provided boundary and topographic surveying services along with an underground utility survey of West End
<br />Park in Miami. The 7-acre active park offers playground, swimming pool, baseball, tennis, pavilion and picnic facilities in addition to a
<br />community center.
<br />c.
<br />(1)TITLE AND LOCATION (City and State)
<br />Miami-Dade Co. Traffic Intersections Topographic Surveys
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Project Surveyor: Under the firm's Miami-Dade Co. Public Works continuing surveying services contract, Miller Legg provided
<br />topographic surveys of five (5) traffic intersections in various parts of the County. The scope entailed location and identification of utility
<br />structures, including invert and pipe information. In addition, mast arm, overhead wire data, horizontal and vertical control data were
<br />included and shown on the surveys.
<br />d.
<br />(1)TITLE AND LOCATION (City and State)
<br />City of Miami Beach Collins Park Parking Garage 2018
<br />Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Project Surveyor: Miller Legg was a subconsultant to the KVC
<br />Constructors/Shulman + Associates Team (and previously the Zaha Hadid Architects/Berenblum Busch Architects Team) providing
<br />property boundary and topographic surveying of the Collins Park Parking Garage, as w ell as topographic surveys of Liberty Avenue from
<br />21st to 23rd Streets. The project will include 513 parking spaces, 15,000 square feet of ground floor retail, and a public p laza. Collins
<br />Park is at the southern end of South Beach, adjacent to the Bass Museum, Miami City Ballet and Miami-Dade Regional Public Library, a
<br />neighborhood considered the cultural destination of Miami Beach.
<br />e.
<br />(1)TITLE AND LOCATION (City and State)
<br />Miami Dade Water and Sewer Department (WASD) 48" Water Transmission
<br />Main Downtown Loop Closure
<br />Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Project Surveyor: Miami-Dade Water and Sewer Department (WASD) had evaluated potential routes for two new water mains to
<br />improve water service in downtown Miami and enhance transmission interconnection capabilities between the North (Hialeah/Pres ton)
<br />and South (Alexander Orr) service area water systems. The resulting Miami Downtown Loop Closure Water Main Pipeline Design Build
<br />project focuses on the design and installation of 48" and 36" water transmission lines for combined Phases I and II. Phase 1 involves the
<br />construction of +/- 4,200 LF of 48" and +/- 300 LF of 30"DIP water transmission main; Phase II involves the construction of +/- 2300 LF of
<br />36" DIP water transmission main. Miller Legg provided topographic survey, utility locates and engineering support services as part of the
<br />Ric-Man Construction/WSP team.
<br />STANDARD FORM 330 (1/2004)PAGE 2
|