Laserfiche WebLink
36 <br />SURVEYOR <br />E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12.NAME <br />Martin Rossi, PSM <br />13.ROLE IN THIS CONTRACT <br />Project Surveyor | SUE <br />14. YEARS EXPERIENCE <br />a.TOTAL <br />41 <br />b.WITH CURRENT FIRM <br />35 <br />15.FIRM NAME AND LOCATION (City and State) <br />Miller Legg, Fort Lauderdale, FL <br />16.EDUCATION (DEGREE AND SPECIALIZATION)17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />FL / Registered Professional Surveyor & Mapper <br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Rossi is a Senior Project Surveyor with more than four decades of surveying and subsurface utility engineering (SUE) expe rience. His principal areas of experience include surveys such as <br />boundary, topographic, ALTA/ACSM land title surveys, quantity, environmental and wetland, condominium, construction layout, as-built, right-of-way, specific purpose and subdivisions and platting, <br />as well as subsurface utility engineering (SUE). He currently manages the survey department and the survey field crews in South Florida. <br />19. RELEVANT PROJECTS <br />a. <br />(1)TITLE AND LOCATION (City and State) <br />City of Sunny Isles Beach Gwen Margolis Park and Pelican Community Park <br />Artificial Turf <br />Sunny Isles Beach, FL <br />(2)YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013 <br />CONSTRUCTION (If Applicable) <br />2013 <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br />Project Surveyor: The project consisted of the reconstruction of existing natural turf fields at Pelican Community Park and Senator Gwen <br />Margolis Park in the City of Sunny Isles Beach with artificial turf. Miller Legg provided the preparation and permitting of drainage plans to <br />collect under the new drain systems installed as part of the project, as well as surveying services. In addition, construction observation was <br />provided to verify compliance with the plans and for the certification of the project throu gh regulatory agencies. <br />b. <br />(1)TITLE AND LOCATION (City and State) <br />City of Miami Gardens Rolling Oaks Regional Park <br />Miami Gardens, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />TBD <br />CONSTRUCTION (If Applicable) <br />TBD <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br />Project Surveyor: Renovations of Rolling Oaks Regional Park include construction of a new one-story 4,000 SF recreation building, <br />renovated restroom facilities, expansion of walking trail with lighting, distance marker, and exerc ise stations, new pavilions, new parking <br />lot, refurbished basketball and tennis courts, new fencing, new shaded playgrounds, new landscaping and irrigation, addition of horseshoe <br />pits, sand volleyball, mini golf and splashpad, and video system and WIFI. Miller Legg is providing civil engineering, landscape architecture <br />and surveying services as a subconsultant to Synalovski, Romanik and Saye Architects. <br />c. <br />(1)TITLE AND LOCATION (City and State) <br />Miami-Dade County Parks, Recreation & Open Space (PROS) Devon Aire <br />Park Shelter <br />Miami, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If Applicable) <br />N/A <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br />Project Surveyor: Miller Legg was retained to provide survey/SUE, design, construction plans, permitting and construction administration <br />for a new shelter and connecting walkways at Devon Aire Park in Miami. The shelter will be used by all age groups and is anticipated to be <br />an extension of the existing playground area. ADA-accessible picnic tables are proposed. Site preparation and earthwork to reshape <br />existing berms are also specified and detailed in the construction documents. Also included is the relocation of trees and the restoration <br />of all areas, including walkways and lawns, which may be damaged during the construction process. <br />d. <br />(1)TITLE AND LOCATION (City and State) <br />Miami-Dade Co. Parks, Recreation & Open Spaces (PROS) Matheson <br />Hammock Park Mangrove Trail Survey <br />Coral Gables, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If Applicable) <br />N/A <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br />Project Surveyor: The Miami-Dade Co. Parks, Recreation and Open Spaces Department embarked on a program of obtaining topographic <br />surveys on a number of County Parks. Miller Legg assisted at Matheson Hammock Park in Coral Gables as part of a mangrove trail <br />renovation project. The firm prepared a survey of the existing trail from Old Cutler Road to the Park east parking lot exit. The survey <br />located and established a survey baseline along the center line, located above ground features at intervals, inner edges of m angrove roots, <br />side gravel entrances and elevations at intervals. This deliverable was provided to meet a tight PROS Department deadline. <br />e. <br />(1)TITLE AND LOCATION (City and State) <br />City of Miami West End Park Survey & SUE <br />Miami, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If Applicable) <br />N/A <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br />Project Surveyor: Miller Legg provided boundary and topographic surveying services along with an underground utility survey of West End <br />Park in Miami. The 7-acre active park offers playground, swimming pool, baseball, tennis, pavilion and picnic facilities in addition to a <br />community center. <br />STANDARD FORM 330 (1/2004)PAGE 2