Laserfiche WebLink
City of Sunny Isles Beach <br />Continuing Professional Consulting Services (CCNA) RFQ No. 20-07-01 <br />Tab D Project Approach and Understanding – Page 7 <br />• We have used Google Sketch-up and GIS to model the anticipated shade from a new or widened bridge. This was <br />performed to document that the new structure will not have an increased shading impact the submerged aquatic <br />vegetation below. This provides significant savings in mitigation costs. <br />• We monitor a 37-acre freshwater littoral marsh habitat that was developed as a mitigation project by a client. By <br />using a drone to monitor the site instead of walking transects, we have reduced the labor cost of field work by 80 <br />percent. <br />