My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
E Sciences
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
E Sciences
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 1:48:05 PM
Creation date
8/24/2020 1:46:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Sunny Isles Beach <br />Continuing Professional Consulting Services (CCNA) RFQ No. 20-07-01 <br />Tab D Project Approach and Understanding – Page 7 <br />• We have used Google Sketch-up and GIS to model the anticipated shade from a new or widened bridge. This was <br />performed to document that the new structure will not have an increased shading impact the submerged aquatic <br />vegetation below. This provides significant savings in mitigation costs. <br />• We monitor a 37-acre freshwater littoral marsh habitat that was developed as a mitigation project by a client. By <br />using a drone to monitor the site instead of walking transects, we have reduced the labor cost of field work by 80 <br />percent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.