My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
E Sciences
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
E Sciences
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 1:48:05 PM
Creation date
8/24/2020 1:46:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> STANDARD FORM 330 (REV. 8/2016) PAGE 23 <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />19. RELEVANT PROJECTS <br />f. <br />(1) TITLE AND LOCATION (City and State) Southwest 137th Avenue, <br />Miami-Dade County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2012 CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm The proposed project is the expansion of SW 137th Avenue from SW 200th Street to US-1. Mr. Voelker assisted with field <br />assessments of wetlands/surface waters and assisted with a GPS tree inventory throughout the ±42-acre project corridor. He <br />also assisted with the preparation of regulatory agency permit applications in association with surface water impacts and tree <br />resource impacts associated with roadway development. Project Budget/Fees: $50,525 <br /> <br />g. <br />(1) TITLE AND LOCATION (City and State) Pennsuco Littoral Shelf Restoration Year Two Maintenance, City of Medley, <br />Miami-Dade County, Florida <br />2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2012 – Ongoing <br />CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm A Miami-Dade County DERM permit was issued to facilitate the 50-year life of mining activities under the Lake Belt Plan. <br />E Sciences assisted Titan with restoring these littoral marsh areas to be in compliance with the permit. Currently, Titan America <br />desires to obtain the Wildlife at Work certification from the Wildlife Habitat Council. E Sciences has been retained to demonstrate <br />that the littoral shelf restoration is contributing to wildlife habitat usage. E Sciences will monitor the site to evaluate the <br />prevalence of amphibians, reptiles, fish and invertebrates, and collect photo-documentation, to complete the application. Mr. <br />Voelker assisted with the monitoring services required for this project. Project Budget/Fees: $126,000 <br /> <br />h. <br />(1) TITLE AND LOCATION (City and State) Markham Park Target Range, <br />Broward County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2012 – Ongoing CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm The proposed project is to modify the stormwater management system to provide storage capacity for a 15.04-acre target/skeet <br />and rifle range area within a 665-acre recreational park. The project proposes clearing, filling and grading a 12.6-acre area to an <br />elevation ranging from 6.5 to 7 feet National Geodetic Vertical Datum as part of lead shot and clay target cleanup operations. <br />The project will impact approximately 4.22 acres of wetlands and approximately 15 acres of wetlands will be enhanced within the <br />Park to offset the wetland impacts. Mr. Voelker is assisting with functional assessments, design and permitting for the 15-acre <br />wetland enhancement area. Project Budget/Fees: $87,093 <br /> <br />i. <br />(1) TITLE AND LOCATION (City and State) Venetian Islands Infrastructure Improvement Arborist Services, <br />City of Miami Beach, Miami-Dade County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2013 – 2014 CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm This project consisted of reviewing an existing tree survey and proposed infrastructure plans to identify potential conflicts <br />between existing trees and proposed infrastructure. E Sciences then performed field visits to visually inspect and mark potential <br />conflict trees. The field visits also involved coordination with the contractor to determine the limits of construction and verify if <br />particular trees would be impacted based upon proposed construction methods. Pending these field visits, E Sciences generated <br />a final plan set mark up and associated tree table identifying conflict trees. Project Budget/Fees: $8,500 <br /> <br />j. <br />(1) TITLE AND LOCATION (City and State) Homestead Air Reserve Base (HARB) Fish Study / Twin Lake / Phantom Lake, <br />Miami-Dade County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2012 – 2014 CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm HARB encompasses a total of 1,943 acres. The base has an extensive fresh-water canal drainage system (total of <br />approximately 80,000 linear feet) consisting of a series of drainage ditches and canals within and along the base boundary. <br />Other aquatic environments on the base include three artificial lakes and a stormwater reservoir. In addition to the lakes and <br />canals, there are 232 acres of previously delineated jurisdictional wetlands present within the boundaries of HARB, the majority <br />of which are located in and around the airfield. E Sciences is contracted to perform three tasks as part of this project: 1) Fish <br />Population/Distribution Study; 2) Twin Lakes Feasibility Study; 3) Phantom Lake Improvement and Constraints Evaluation Study. <br />We will evaluate the distributions and populations of non-native and native fish species within the aforementioned water bodies <br />to give a baseline report of current ecological conditions. We will also evaluate the potential to enhance and maintain the natural <br />communities surrounding and within the Twin Lakes by supporting native fish and wildlife species while at the same time not <br />increasing the potential for bird strike hazards. Mr. Voelker assists with the evaluations and reporting of these services. Project <br />Budget/Fees: $151,849.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.