|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br />
<br />12. NAME
<br />
<br />Juan S. Calderon, PE, PTOE
<br />13. ROLE IN THIS CONTRACT
<br />
<br />Project Manager
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />20
<br />b. WITH CURRENT FIRM
<br />9
<br />15. FIRM NAME AND LOCATION (City and State)
<br />CALTRAN Engineering Group, Inc. – 790 NW 107 Ave. Suite 200, Miami FL 33172
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br /> MS in Civil Engineering, Florida International University, Florida 1999 Professional Engineer in Florida No. 58569, 2002
<br />BS in Civil Engineering; University Santo Tomas, Bogota, Colombia 1997 Professional Traffic Operations Engineer No. 1301, 2004
<br /> Professional Transportation Planner No. 20, 2007
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br /> Mr. Calderon has over 20 years of experience in traffic/ transportation engineering with a Master Degree in Civil Engineering. Mr. Calderon has been
<br />involved in managing multiple traffics and planning engineering projects with the FDOT and related contracts. Likewise, he h as participated actively in
<br />preliminary engineering reports, design project and planning, development of alternatives, conceptual designs, corridor studies, simulation, and GIS.
<br />19. RELEVANT PROJECTS
<br />
<br />
<br />
<br />
<br />
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />Downtown Miami Streets (Lane Elimination) SW/ SE 1st Street
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017-2018
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Provided traffic engineering services as part of feasibility study to apply Complete Streets concepts; existing conditions analysis, traffic analysis for
<br />no build and build conditions, transit system operation analysis. Study recommended lane elimination and 1st bus preferential lane only in Miami-
<br />Dade County. Responsible for design to apply a Complete Streets concept; included provided signing & pavement marking plans including bike lane
<br />and bus preferential lane. Responsible for before-after study evaluation of Complete Streets concept; included survey, traffic and non-motorized data
<br />collection, safety evaluation, travel time for vehicular and transit. Contact: Patrice Smith/Neal Schafer (305)379-6566, schafers@miamidda.com.
<br />
<br />
<br />
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />City of Coral Gables Comprehensive Multimodal Transportation Plan
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016-2018
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Plan to develop 10-year blueprint to improve city's transportation system and address key mobility needs to provide better travel choices for
<br />residents, visitors, City employees. Conducted data collection and served as technical advisor for new traffic calming master plan. Contact: Atkins
<br />North America, Jack S. Schnettler, PE, (305) 514-3369, jack.schnettler@atkinsglobal.com
<br />
<br />
<br />
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />NW 17 Street Traffic Impact Analysis
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016- 2018
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />This project ensure a healthy traffic environment for the City of Sweetwater residents, visitors, and proposed businesses developments through the
<br />proposed public facilities and services typical sections at NW 17th Street between NW 111th Avenue/ NW 112th Avenue and NW 108th Avenue, as
<br />well as NW 110th Avenue, between NW 17th including committed developments assessment, provide a micro-simulation of existing and future
<br />conditions during AM and PM peak periods, concurrency analysis, turn lane evaluation, and determine recommendations to mitig ate possible
<br />impacts. Contact: Alvarez Engineers Inc. Juan Alvarez, 305-640-1345.
<br />
<br />
<br />
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />Traffic Study of Miramar Parkway & Palm Avenue Modification
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012-2013
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Reviewed and supervised traffic data collection activities for preparation of traffic study that included turning movement counts for intersection.
<br />Included traffic signal design with roadway signing and pavement markings to implement modifications at intersection of Miramar Pkwy and Palm
<br />Ave. Contact: Bissy Bempala, 954-602-3323.
<br />
<br />
<br />
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />City of Oakland Park
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017-Ongoing
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Included Traffic Impact Reviews for private applications such new hospital, revision of traffic calming ordinance, re-development of traffic calming
<br />program, assistance with roadway design consulting to improve two roundabouts at NW 38th St with NW 3rd Ave and NW 5th Ave to determine
<br />geometric modifications to enhance traffic pattern deflections within inner travel lanes. Contact: Albert J. Carbon III, PE, 954-630-4257,
<br />albertc@oaklandparkfl.gov.
<br />
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />
<br />54
|