Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> <br />12. NAME <br /> <br />Juan S. Calderon, PE, PTOE <br />13. ROLE IN THIS CONTRACT <br /> <br />Project Manager <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />20 <br />b. WITH CURRENT FIRM <br />9 <br />15. FIRM NAME AND LOCATION (City and State) <br />CALTRAN Engineering Group, Inc. – 790 NW 107 Ave. Suite 200, Miami FL 33172 <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br /> MS in Civil Engineering, Florida International University, Florida 1999 Professional Engineer in Florida No. 58569, 2002 <br />BS in Civil Engineering; University Santo Tomas, Bogota, Colombia 1997 Professional Traffic Operations Engineer No. 1301, 2004 <br /> Professional Transportation Planner No. 20, 2007 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> Mr. Calderon has over 20 years of experience in traffic/ transportation engineering with a Master Degree in Civil Engineering. Mr. Calderon has been <br />involved in managing multiple traffics and planning engineering projects with the FDOT and related contracts. Likewise, he h as participated actively in <br />preliminary engineering reports, design project and planning, development of alternatives, conceptual designs, corridor studies, simulation, and GIS. <br />19. RELEVANT PROJECTS <br /> <br /> <br /> <br /> <br /> <br /> <br />a. <br />(1) TITLE AND LOCATION (City and State) <br /> <br />Downtown Miami Streets (Lane Elimination) SW/ SE 1st Street <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017-2018 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Provided traffic engineering services as part of feasibility study to apply Complete Streets concepts; existing conditions analysis, traffic analysis for <br />no build and build conditions, transit system operation analysis. Study recommended lane elimination and 1st bus preferential lane only in Miami- <br />Dade County. Responsible for design to apply a Complete Streets concept; included provided signing & pavement marking plans including bike lane <br />and bus preferential lane. Responsible for before-after study evaluation of Complete Streets concept; included survey, traffic and non-motorized data <br />collection, safety evaluation, travel time for vehicular and transit. Contact: Patrice Smith/Neal Schafer (305)379-6566, schafers@miamidda.com. <br /> <br /> <br /> <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) <br /> <br />City of Coral Gables Comprehensive Multimodal Transportation Plan <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016-2018 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Plan to develop 10-year blueprint to improve city's transportation system and address key mobility needs to provide better travel choices for <br />residents, visitors, City employees. Conducted data collection and served as technical advisor for new traffic calming master plan. Contact: Atkins <br />North America, Jack S. Schnettler, PE, (305) 514-3369, jack.schnettler@atkinsglobal.com <br /> <br /> <br /> <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) <br /> <br />NW 17 Street Traffic Impact Analysis <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016- 2018 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />This project ensure a healthy traffic environment for the City of Sweetwater residents, visitors, and proposed businesses developments through the <br />proposed public facilities and services typical sections at NW 17th Street between NW 111th Avenue/ NW 112th Avenue and NW 108th Avenue, as <br />well as NW 110th Avenue, between NW 17th including committed developments assessment, provide a micro-simulation of existing and future <br />conditions during AM and PM peak periods, concurrency analysis, turn lane evaluation, and determine recommendations to mitig ate possible <br />impacts. Contact: Alvarez Engineers Inc. Juan Alvarez, 305-640-1345. <br /> <br /> <br /> <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) <br /> <br />Traffic Study of Miramar Parkway & Palm Avenue Modification <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2012-2013 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Reviewed and supervised traffic data collection activities for preparation of traffic study that included turning movement counts for intersection. <br />Included traffic signal design with roadway signing and pavement markings to implement modifications at intersection of Miramar Pkwy and Palm <br />Ave. Contact: Bissy Bempala, 954-602-3323. <br /> <br /> <br /> <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) <br /> <br />City of Oakland Park <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017-Ongoing <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Included Traffic Impact Reviews for private applications such new hospital, revision of traffic calming ordinance, re-development of traffic calming <br />program, assistance with roadway design consulting to improve two roundabouts at NW 38th St with NW 3rd Ave and NW 5th Ave to determine <br />geometric modifications to enhance traffic pattern deflections within inner travel lanes. Contact: Albert J. Carbon III, PE, 954-630-4257, <br />albertc@oaklandparkfl.gov. <br /> <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br /> <br />54