|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br />12. NAME
<br />
<br />Jeannelia P. Liu, PE
<br />13. ROLE IN THIS CONTRACT
<br />
<br />Senior Project Engineer
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />23
<br />b. WITH CURRENT FIRM
<br />4
<br />15. FIRM NAME AND LOCATION (City and State)
<br />CALTRAN Engineering Group, Inc. – 790 NW 107 Ave. Suite 200, Miami FL 33172
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />
<br />Bachelor of Science in Civil Engineering; University of Miami 1996 Professional Engineer in Florida No. 575656, 200
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mrs. Liu has a wide-range of experience in consulting engineering and information management throughout her 23 year career. Her
<br />experience included nine years of involvement providing project management services to various GIS, planning, studies and data
<br />collection projects. Mrs. Liu has been involved in numerous roadway designs and planning project in FDOT.
<br />
<br /> 19. RELEVANT PROJECTS
<br />
<br />
<br />
<br />
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />Districtwide Modal Development Consultant Service, FDOT D6
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018-Ongoing
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROL Check if project performed with current firm
<br />Served as Deputy Project Manager. Services provided include on-site support, administrative support for scope development of
<br />Districtwide truck parking study, plans reviews of MOTs for railroad crossings. Contract No. CA148, FM 432451-4-12-01, Contact:
<br />Dionne Richardson, FDOT D6, 305-470-5292
<br />
<br />
<br />
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />Modal Development Inspection Services, FDOT D6
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018-Ongoing
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Provided Alternatives form improvements at the interchange of SR 112/LeJeune Road/Okeechobee Road. As part of the tasks
<br />assigned included evaluation of existing conditions, traffic data collection including big data evaluation for origin-destination (HERE
<br />Data, Bluetooth, and Streetlight), operational analysis microsimulation model development, provide documentation for the Desi gn
<br />Traffic Technical Memorandum (DTTM), conceptual improvements assessment for Tier 1 and Tier 2 including long and short term
<br />Improvements. Provide final recommendations, assist in cost estimates and support in public involvement. Contact: Jacob, Ana Elias
<br />(954) 246-1243
<br />
<br />
<br />
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />Scoping Report Contract, FDOT D6
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019-Ongoing
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Served as Project Manager and Engineer of Record. Prepared Pavement Restoration Assessment report for RRR for FDOT D6
<br />Planning and Environmental Management Office along SR 90/SW 8 St from E of SW 42 Ave to W of SW 27 Ave. Project programmed
<br />for construction in 2022 to preserve and extend life of roadway by milling and resurfacing existing pavement and enhance gene ral
<br />highway safety. Contract No. CA354, FM 250759-3-22-03; Contact: Godfrey Lamptey, P.E., PTOE, 786-600-3350,
<br />godfrey.lamptey@goaleng.com
<br />
<br />
<br />
<br />
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />FDOT D6, Transportation Statistics Support No.3, Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012-2017
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Multiple assignments; included Enhanced Pavement Management Program with primary objective to develop framework of reliable
<br />mechanisms to ensure and accurately identify all FDOT D6 pavement deficient segments to be assigned for scoping and gaming.
<br />Provided PTMS design services, coordinated and reviewed traffic data collection, provided engineering in-house support.
<br />Contract C9617, FM No. 40819911203
<br />Contact: Neil Lyn, FDOT D6 Project Manager, 305-470-5373
<br />
<br />
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />SR 976/Bird Road from SR 821/Heft to US1/South Dixie Hwy
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016-Ongoing
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Engineer in charge of conducting the analysis of The 5-leg intersection of Bird Road (S.W. 40th Street), Granada Blvd and University
<br />Dr. As a part of concept development. One alternative was to convert the 5-leg intersection into a roundabout (which will not be
<br />analyzed at this stage). The other alternative was to convert University Dr. from a two-way street, into a one-way street (between
<br />Toledo Street and Granada Blvd). Toledo Street and Granada Blvd).
<br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2
|