My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Caltran
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Caltran
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 2:49:34 PM
Creation date
8/24/2020 2:48:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />55 <br /> <br /> <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />1 <br />21. TITLE AND LOCATION (City and State) <br /> <br />Pedestrian Bridge Justification Report,A1A Between 178th ST and 183rd ST <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018-2019 <br />CONSTRUCTION (If applicable) <br /> <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER <br />City of Sunny Isles <br />b. POINT OF CONTACT NAME <br />Claudia C. Hasbun <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(305) 792-1757 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />Provided justification report; included 12-hour pedestrian and bicycle data collection at existing mid-block crossing, traffic volume and pedestrian <br />behavioral data collection and analysis for existing and future build-out scenarios. Micro simulation analysis performed to assess delay imposed <br />on network by mid-block crossing. Analyzed safety concerns, assessed crash data, conducted cost-benefit analysis based on construction cost <br />and benefits from travel time and safety improvements. <br /> <br />Total $ 13,400.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> <br />a. <br />(1) FIRM NAME <br /> <br />CALTRAN Engineering Group, Inc. <br />(2) FIRM LOCATION (City and State) <br /> <br />Miami, Florida <br />(3) ROLE <br /> <br />Prime <br /> <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br /> <br />c. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br /> <br />d. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br /> <br />e. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br /> <br />f. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
The URL can be used to link to this page
Your browser does not support the video tag.