|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br />
<br />12. NAME
<br />
<br />Carlos Borges
<br />13. ROLE IN THIS CONTRACT
<br />
<br />Civil Engineer
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />18
<br />b. WITH CURRENT FIRM
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />CALTRAN Engineering Group, Inc. – 15800 S
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />Bachelor Degree in Civil Engineering
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />
<br />Mr. Borges has several years of professional experience in Transportation Engineering, which includes experience in Roadway Design.
<br />Responsibilities included design of components of highway design project including, roadway design, plans review and specifications, plans
<br />production, utility coordination, traffic control design among others
<br />19. RELEVANT PROJECTS
<br />
<br />
<br />
<br />
<br />
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />FDOT D6, SW 336/Davis Pkwy from SR-997/Krome Ave to US-1
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018-Ongoing
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Reconstruction of Davis Pkwy to extend capacity of existing pavement to facilitate truck bypass, add right turn lanes at intersections of Davis
<br />Pkwy/Krome Ave and Davis Pkwy/US-1, improving drainage throughout project limits. Reconstruction activities included adding sidewalk, repaving
<br />and restriping roadway, installing curb ramps, upgrading lighting, signalization, signing and pavement markings and crosswalks. Responsible for
<br />providing roadway, drainage system and temporary traffic control design services, signing & pavement marking improvements, and signalization and
<br />lighting design. Contract No. C9O63, FM No. 405575-7-32-01. Contact: Nathan Pulido, FDOT D6, 305-470-5207; Nathan.Pulido@dot.state.fl.us
<br />
<br />
<br />
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />FDOT D4, Homewood Blvd from Old Germnaton Rd to Lowson Blvd
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018-Ongoing
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mobility project in Delray Beach. Included roadway widening and/or lane repurposing to accommodate designated bike lanes and sidewalks on both
<br />sides of road, construction of cast-in-place retaining wall at LWDD L-36 Canal crossing, signal replacement at Linton Blvd intersection. Contract No.
<br />CA220, FM 438394-1-32-01 Contact: Angelene Frederick, FDOT D4, 954-777-4650, angelene.frederick@dot.state.fl.us.
<br />
<br />
<br />
<br />
<br />
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />SR-5/S Dixie Hwy from N of SW 336th St to S of SW 304th St
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018-Ongoing
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />RRR project to preserve and extend life of roadway by milling and resurfacing existing pavement and to enhance general highway safety.
<br />Responsible for temporary traffic control plan, signing & pavement markings, signalization, traffic monitoring site design components.
<br />Contract No.: CA208, FM 441827-1-32-01 Contact: Alfredo Cely, P.E., Kissinger Campo, 813-871-5331, alfredo.cely@kissingercampo.com
<br />
<br />
<br />
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />FDOT D6, SR-5/US-1/S Dixie Hwy from E of SR-9/SW 27th Ave to SR-9A/I-95
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018-Ongoing
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />RRR project on US-1 corridor to extend service life and safety while improving roadway and operational deficiencies. Conducted extensive coordination
<br />with City of Miami, FDOT D6, and Miami-Dade Dept of Transportation and Public Works. Included roadway design and coordination of additional
<br />components (drainage system design, temporary traffic control design, signing and pavement marking improvements, signalization and lighting design).
<br />Contract No. C9U15, FM 433455-4-32-01. Contact: Adriana Manzanarez, P.E., 305-470-5283, adriana.manzanares@dot.state.fl.us
<br />
<br />
<br />
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />FDOT D4, Local Agency Program (LAP) Coordinator
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015-2018
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Continuing services contract, included yearly review and scoping efforts for all mobility projects received from Broward MPO, Palm Beach TPA,
<br />Treasure Coast Transportation Council. Also included staff augmentation and miscellaneous support needed by District Program Management Office.
<br />Contract No.: CA256, FM 424270-6-32-01. Contact: Stacy L. Miller, P.E., 954-777-434.
<br />
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
|