Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> <br />12. NAME <br /> <br />Carlos Borges <br />13. ROLE IN THIS CONTRACT <br /> <br />Civil Engineer <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />18 <br />b. WITH CURRENT FIRM <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />CALTRAN Engineering Group, Inc. – 15800 S <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Bachelor Degree in Civil Engineering <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />Mr. Borges has several years of professional experience in Transportation Engineering, which includes experience in Roadway Design. <br />Responsibilities included design of components of highway design project including, roadway design, plans review and specifications, plans <br />production, utility coordination, traffic control design among others <br />19. RELEVANT PROJECTS <br /> <br /> <br /> <br /> <br /> <br /> <br />a. <br />(1) TITLE AND LOCATION (City and State) <br /> <br />FDOT D6, SW 336/Davis Pkwy from SR-997/Krome Ave to US-1 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018-Ongoing <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Reconstruction of Davis Pkwy to extend capacity of existing pavement to facilitate truck bypass, add right turn lanes at intersections of Davis <br />Pkwy/Krome Ave and Davis Pkwy/US-1, improving drainage throughout project limits. Reconstruction activities included adding sidewalk, repaving <br />and restriping roadway, installing curb ramps, upgrading lighting, signalization, signing and pavement markings and crosswalks. Responsible for <br />providing roadway, drainage system and temporary traffic control design services, signing & pavement marking improvements, and signalization and <br />lighting design. Contract No. C9O63, FM No. 405575-7-32-01. Contact: Nathan Pulido, FDOT D6, 305-470-5207; Nathan.Pulido@dot.state.fl.us <br /> <br /> <br /> <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) <br /> <br />FDOT D4, Homewood Blvd from Old Germnaton Rd to Lowson Blvd <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018-Ongoing <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mobility project in Delray Beach. Included roadway widening and/or lane repurposing to accommodate designated bike lanes and sidewalks on both <br />sides of road, construction of cast-in-place retaining wall at LWDD L-36 Canal crossing, signal replacement at Linton Blvd intersection. Contract No. <br />CA220, FM 438394-1-32-01 Contact: Angelene Frederick, FDOT D4, 954-777-4650, angelene.frederick@dot.state.fl.us. <br /> <br /> <br /> <br /> <br /> <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) <br /> <br />SR-5/S Dixie Hwy from N of SW 336th St to S of SW 304th St <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018-Ongoing <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />RRR project to preserve and extend life of roadway by milling and resurfacing existing pavement and to enhance general highway safety. <br />Responsible for temporary traffic control plan, signing & pavement markings, signalization, traffic monitoring site design components. <br />Contract No.: CA208, FM 441827-1-32-01 Contact: Alfredo Cely, P.E., Kissinger Campo, 813-871-5331, alfredo.cely@kissingercampo.com <br /> <br /> <br /> <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) <br /> <br />FDOT D6, SR-5/US-1/S Dixie Hwy from E of SR-9/SW 27th Ave to SR-9A/I-95 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018-Ongoing <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />RRR project on US-1 corridor to extend service life and safety while improving roadway and operational deficiencies. Conducted extensive coordination <br />with City of Miami, FDOT D6, and Miami-Dade Dept of Transportation and Public Works. Included roadway design and coordination of additional <br />components (drainage system design, temporary traffic control design, signing and pavement marking improvements, signalization and lighting design). <br />Contract No. C9U15, FM 433455-4-32-01. Contact: Adriana Manzanarez, P.E., 305-470-5283, adriana.manzanares@dot.state.fl.us <br /> <br /> <br /> <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) <br /> <br />FDOT D4, Local Agency Program (LAP) Coordinator <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015-2018 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Continuing services contract, included yearly review and scoping efforts for all mobility projects received from Broward MPO, Palm Beach TPA, <br />Treasure Coast Transportation Council. Also included staff augmentation and miscellaneous support needed by District Program Management Office. <br />Contract No.: CA256, FM 424270-6-32-01. Contact: Stacy L. Miller, P.E., 954-777-434. <br /> <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2