|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br />
<br />12. NAME
<br />
<br />Juan Pablo Romero, EI
<br />13. ROLE IN THIS CONTRACT
<br />
<br />Traffic Engineer
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />10
<br />b. WITH CURRENT FIRM
<br />8
<br />15. FIRM NAME AND LOCATION (City and State)
<br />CALTRAN Engineering Group, Inc. – 790 NW 107 Ave. Suite 200, Miami FL 33172
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />BS in Civil Engineering, Florida International University 2010 Fundaments 101, 102, and 103 (Distance Learning) TranStat RCI Intermediate Field Data Collection. FDOT 2013 Road Safety Assessment for Local Govt. University of Florid
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br /> Mr. Romero has been involved in various planning projects, studies and data collection projects. He is experience in conducting various types of traffic
<br />studies including traffic counts, vehicle classifications, turning movement studies, speed studies, travel time and delay studies, parking studies, vehicle gap
<br />studies, and roadway characteristics inventory. He is responsible for the preparation of routes, schedules, maps, and all other materials required for field
<br />data collection.
<br /> 19. RELEVANT PROJECTS
<br />
<br />
<br />
<br />
<br />
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />Downtown Miami Streets (Lane Elimination) SW/ SE 1st Street
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017-2018
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Provided traffic engineering services as part of feasibility study to apply Complete Streets concepts. Provided existing conditions analysis, traffic
<br />analysis for no build and build conditions, transit system operation analysis. Study recommended lane elimination and 1st bus preferential lane only
<br />in Miami-Dade County. Responsible for design to apply a Complete Streets concept; included provided signing & pavement marking plans including
<br />bike lane and bus preferential lane. Responsible for before-after study evaluation of Complete Streets concept; included survey, traffic and non-
<br />motorized data collection, safety evaluation, travel time for vehicular and transit. Contact: Patrice Smith/Neal Schafers, 305-379-6566,
<br />schafers@miamidda.com
<br />
<br />
<br />
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />City of Coral Gables Comprehensive Multimodal Transportation Plan
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016-2018
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Plan to develop 10-year blueprint to improve city's transportation system and address key mobility needs to provide better travel choices for
<br />residents, visitors, City employees. Conducted data collection and served as technical advisor for new traffic calming master plan.
<br />Contact: Jack Schnettler, P.E., Atkins North America, 305-514-3369, jack.schnettler@atkinsglobal.com
<br />
<br />
<br />
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />NW 17 Street Traffic Impact Analysis
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016- 2018
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />This project ensure a healthy traffic environment for the City of Sweetwater residents, visitors, and proposed businesses developments through the
<br />proposed public facilities and services typical sections at NW 17th Street between NW 111th Avenue/ NW 112th Avenue and NW 108th Avenue, as
<br />well as NW 110th Avenue, between NW 17th including committed developments assessment, provide a micro-simulation of existing and future
<br />conditions during AM and PM peak periods, concurrency analysis, turn lane evaluation, and determine recommendations to mitig ate possible
<br />impacts. Contact: Alvarez Engineers Inc. Juan Alvarez, 305-640-1345
<br />
<br />
<br />
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />SR 976/Bird Road from SR 821/Heft to US1/South Dixie Hwy
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016-Ongoing
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Major EW principal arterial critical in facilitating movement of local and regional traffic in central Miami-Dade County. Analyzed Coral Gables segment
<br />between Red Rd/US-1, including existing conditions, identification of recurring congestion locations, evaluation of multimodal transportation
<br />improvement needs based on future travel demand, identification of conceptual improvements for congested locations along segment; provided
<br />recommendations for future improvements. Contract: C9R17, FM 434845-4-22-01, Contact: Godfrey Lamptey, P.E., PTOE, Goal Associates, 786-
<br />600-3350, godfrey.lamptey@goaleng.com
<br />
<br />
<br />
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />City of Oakland
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017-Ongoing
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Included Traffic Impact Reviews for private applications such new hospital, revision of traffic calming ordinance, re-development of traffic calming
<br />program, assistance with roadway design consulting to improve two roundabouts at NW 38th St with NW 3rd Ave and NW 5th Ave to determine
<br />geometric modifications to enhance traffic pattern deflections within inner travel lanes. Contact: Albert J. Carbon III, P.E., City of Oakland Park,
<br />954-630-4257, albertc@oaklandparkfl.gov
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
|