Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> <br />12. NAME <br /> <br />Juan Pablo Romero, EI <br />13. ROLE IN THIS CONTRACT <br /> <br />Traffic Engineer <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />10 <br />b. WITH CURRENT FIRM <br />8 <br />15. FIRM NAME AND LOCATION (City and State) <br />CALTRAN Engineering Group, Inc. – 790 NW 107 Ave. Suite 200, Miami FL 33172 <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />BS in Civil Engineering, Florida International University 2010 Fundaments 101, 102, and 103 (Distance Learning) TranStat RCI Intermediate Field Data Collection. FDOT 2013 Road Safety Assessment for Local Govt. University of Florid <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> Mr. Romero has been involved in various planning projects, studies and data collection projects. He is experience in conducting various types of traffic <br />studies including traffic counts, vehicle classifications, turning movement studies, speed studies, travel time and delay studies, parking studies, vehicle gap <br />studies, and roadway characteristics inventory. He is responsible for the preparation of routes, schedules, maps, and all other materials required for field <br />data collection. <br /> 19. RELEVANT PROJECTS <br /> <br /> <br /> <br /> <br /> <br /> <br />a. <br />(1) TITLE AND LOCATION (City and State) <br /> <br />Downtown Miami Streets (Lane Elimination) SW/ SE 1st Street <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017-2018 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Provided traffic engineering services as part of feasibility study to apply Complete Streets concepts. Provided existing conditions analysis, traffic <br />analysis for no build and build conditions, transit system operation analysis. Study recommended lane elimination and 1st bus preferential lane only <br />in Miami-Dade County. Responsible for design to apply a Complete Streets concept; included provided signing & pavement marking plans including <br />bike lane and bus preferential lane. Responsible for before-after study evaluation of Complete Streets concept; included survey, traffic and non- <br />motorized data collection, safety evaluation, travel time for vehicular and transit. Contact: Patrice Smith/Neal Schafers, 305-379-6566, <br />schafers@miamidda.com <br /> <br /> <br /> <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) <br /> <br />City of Coral Gables Comprehensive Multimodal Transportation Plan <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016-2018 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Plan to develop 10-year blueprint to improve city's transportation system and address key mobility needs to provide better travel choices for <br />residents, visitors, City employees. Conducted data collection and served as technical advisor for new traffic calming master plan. <br />Contact: Jack Schnettler, P.E., Atkins North America, 305-514-3369, jack.schnettler@atkinsglobal.com <br /> <br /> <br /> <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) <br /> <br />NW 17 Street Traffic Impact Analysis <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016- 2018 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />This project ensure a healthy traffic environment for the City of Sweetwater residents, visitors, and proposed businesses developments through the <br />proposed public facilities and services typical sections at NW 17th Street between NW 111th Avenue/ NW 112th Avenue and NW 108th Avenue, as <br />well as NW 110th Avenue, between NW 17th including committed developments assessment, provide a micro-simulation of existing and future <br />conditions during AM and PM peak periods, concurrency analysis, turn lane evaluation, and determine recommendations to mitig ate possible <br />impacts. Contact: Alvarez Engineers Inc. Juan Alvarez, 305-640-1345 <br /> <br /> <br /> <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) <br /> <br />SR 976/Bird Road from SR 821/Heft to US1/South Dixie Hwy <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016-Ongoing <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Major EW principal arterial critical in facilitating movement of local and regional traffic in central Miami-Dade County. Analyzed Coral Gables segment <br />between Red Rd/US-1, including existing conditions, identification of recurring congestion locations, evaluation of multimodal transportation <br />improvement needs based on future travel demand, identification of conceptual improvements for congested locations along segment; provided <br />recommendations for future improvements. Contract: C9R17, FM 434845-4-22-01, Contact: Godfrey Lamptey, P.E., PTOE, Goal Associates, 786- <br />600-3350, godfrey.lamptey@goaleng.com <br /> <br /> <br /> <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) <br /> <br />City of Oakland <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017-Ongoing <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Included Traffic Impact Reviews for private applications such new hospital, revision of traffic calming ordinance, re-development of traffic calming <br />program, assistance with roadway design consulting to improve two roundabouts at NW 38th St with NW 3rd Ave and NW 5th Ave to determine <br />geometric modifications to enhance traffic pattern deflections within inner travel lanes. Contact: Albert J. Carbon III, P.E., City of Oakland Park, <br />954-630-4257, albertc@oaklandparkfl.gov <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2