Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> <br />12. NAME <br /> <br />Moe Lavasani, PhD., E.I. <br />13. ROLE IN THIS CONTRACT <br />Transportation Modelers & GIS Analyst <br />Programmer <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />9 <br />b. WITH CURRENT FIRM <br />4 <br />15. FIRM NAME AND LOCATION (City and State) <br />CALTRAN Engineering Group, Inc. – 410 S. Ware Blvd., Suite 405, Tampa, FL 33619 <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Ph.D. in Civil Engineering, Florida International University, 2016 Professional Engineer in Florida No. 89159, 2020 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> Mr. Lavasani has been involved in various Travel Demand Modeling, GIS, planning, traffic impact analysis studies and data collection projects. He is working as travel demand modeler, Big Data and GIS analyst. He is experienced in conduction planning studies including developing a methodology to use HERE/RITIS travel time data to report monthly performance of the State Highways, transportation model stud ies including traffic counts, turning movement studies, travel time and delay studies, parking studies and traffic impact studies. <br />19. RELEVANT PROJECTS <br /> <br /> <br /> <br /> <br /> <br /> <br />a. <br />(1) TITLE AND LOCATION (City and State) <br /> <br />SERPM 8.0 Future Mobility Analysis <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />CALTRAN Engineering Group, Inc. supported analysis of the future mobility test runs (AV/CV) on SERPM 7.0 with the results <br />presented in Model Task Force 2019. The task targeted to review emerging technologies and trends (AV/CV), development and <br />implementation of various scenarios including travel behavior scenarios, technology scenarios and also network related scenar ios. <br />Residential location choice, Auto Ownership and network characterist ics were modified to test various scenarios. Contact: Marty <br />Milkovits [Cambridge Systematics], (781)539-6801 & Hui Zhao [FDOT D4], (954)777-4635. <br /> <br /> <br /> <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) <br /> <br />NW 154th Street Bridge Opening Study <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2020 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />CALTRAN Engineering Group provided Origin-Destination study and cursory subarea modeling to understand the implication of <br />opening NW 154th Street bridge over I-75 expressway in Miami-Dade County. CALTRAN used Streetlight data for the O-D analysis and <br />Cube SERPM 8.0 to understand the impact of the study overpass on the subarea network. Contact: Eugenio S. Lopez [Choice <br />Engineering, (786)250-5526. <br /> <br /> <br /> <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) <br /> <br />Charlotte County Deep Creek MSBU Sidewalk Master Plan <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019-2020 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />CALTRAN Engineering Group was selected by Charlotte County Department of Public Works to design a sidewalk master plan and <br />project prioritization. CALTRAN provided existing sidewalk inventory analysis, methodology to grade potential sidewalks consi dering <br />Safe Routes to School (SRTS) concepts, crash history, pedestrian and bicycle demand, etc. and provided prioritization strategies for <br />potential sidewalks. Contact: Sherri Ouimet [Charlotte County], (941)575-3600 <br /> <br /> <br /> <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) <br /> <br />Charlotte County Parking Lots Site Inspection <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018-2019 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />CALTRAN Engineering Group was retained by the Charlotte County to inspect County-owned facilities parking lots to assess existing <br />general condition of the sites and pavement condition. CALTRAN provided a scoring system and flowchart to prioritize the reha bilitation <br />strategies. Contact: Gary Burdahl, Charlotte County, (941)623-1009. <br /> <br /> <br /> <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) <br /> <br />US-1 Bayfront Area Road Diet <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017-2018 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Conducted corridor feasibility study that required analysis of existing conditions, identification of recurrent congestion lo cations, <br />evaluation of improvements needs based on future travel demand. Evaluated multimodal needs along facility, identified conceptual <br />improvements by providing recommendations considering TSM&O techniques, future land uses, capital and operating cost <br />effectiveness, and transit priority and Complete Streets initiatives. US-1/Bayfront Area road diet assessed to re-allocate roadway space <br />to better meet current user needs to understand impacts of removing one lane in each direction along US -1 corridor in Miami's <br />Downtown Bayfront area. Contact: Tindale Oliver, Demian Miller. 813-224-8862, dmiller@tindaleoliver.com <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2