Laserfiche WebLink
schedule <br />and costs. 4 <br />5. Documented oral communications in Daily Reports, <br />logs, or <br />other means. 4 <br />6. Prepared written communications in the form, format, <br />and <br />details required by CPAM,etc. & within the appropriate <br />time frame 5 <br />Project Documentation <br />1. Kept Monthly and Final estimates up to date as the project <br />progressed. 4 <br />2. Tracked and monitored RFI's, shop drawings, contract <br />changes, <br />and other action items to achieve timely resolution. 4 <br />3. Prepared and organized thorough and complete project <br />documentation including a clear filing system, Daily <br />diaries, <br />claims documentation, Compliance monitoring and <br />documentation, <br />weather letters, and other project records. 4 <br />4. Input information and documentation into Site Manager, <br />EDMS, <br />and CQR/LIMS in a timely manner. 4 <br />Effective Administration of the Construction Contract <br />1. Administered the contract according to plans, <br />specifications <br />and Contract provisions. Provided clear and timely <br />interpretation <br />of contract documents to Contractor. 4 <br />2. Reviewed, approved, and monitored the Contractor's <br />QC plan. <br />Took action when necessary. Verified that materials used <br />by the <br />Contractor substantially conformed to plans, specifications <br />and <br />contract provisions. 5 <br />3. Provided daily inspection and testing services as <br />required by <br />the contract and shared results with the Contractor. <br />Reviewed <br />Page 4 of 7Consultant Evaluation Tests/Responses by Contract <br />12/4/2015http://tlhost01.dot.state.fl.us/sas-cgi/broker