Page 12
<br />TAB F: FIRM REFERENCES & SIMILAR WORK COMPLETED
<br />RFQ: 20-07-01 Continuing Professional Services - Construction Engineering & Inspection (CEI)
<br />FIRM REFERENCES & SIMILAR WORK COMPLETED
<br />Eisman & Russo, Inc. (E&R) is extremely proud of our record of past professional accomplishments and ex-
<br />perience in Construction Engineering & Inspection services. We have successfully completed hundreds of
<br />CEI projects for the FDOT and Florida municipalities ranging from $2 million to upwards of $500 million in
<br />construction value.
<br />Our CEI culture is to take ownership of a project, be a catalyst for solutions, and exercise good professional
<br />judgment making decisions and keeping the project moving; we are comfortable using the “Engineering”
<br />in CEI. We embrace Contractor Engagement and Partnering as critical to success. We have a clear history of
<br />partnering and being a catalyst to the construction process which can be evidenced on past projects by our
<br />contractors achieving incentives, completing projects on time and on budget and having virtually no claims.
<br />SR 821 Homestead Extension of Florida’s Turnpike (HEFT) Widening from SW 288 St to SW 216 St, Miami, FL,
<br />Florida Turnpike Enterprise (FTE)
<br />Reference: Karen Akers, PE, 954.934.1178, Karen.Akers@dot.state.fl.us
<br />Mile Post 64, Pampano Beach Services Plaza, Pompano Beach, FL 33069
<br />Construction Cost: $70M
<br />11/2015 to 2/2020
<br />Eisman & Russo provided Construction Engineering & Inspection (CEI) services for this $70M
<br />Design Build widening project along the Homestead Extension of Florida’s Turnpike that included
<br />8 miles of noise wall installations, median widening of 7 miles of roadway to accommodate addi-
<br />tional capacity, roadway realignment, drainage and stormwater management system construction,
<br />two bridge widenings, new roadway construction, and milling an resurfacing. A new tolling point
<br />on the Turnpike was constructed as part of the project to replace an existing building and new
<br />roadway alignment.
<br />The project included safety improvements as well by replacing the high tension cable barrier
<br />with guardrail and the addition of roadway lighting throughout the entire project limits which pre-
<br />viously existed only at entry/exit interchanges. Other scope of work included new overhead sign
<br />structures and ground mounted signs throughout, minor Intelligent Transportation System device
<br />upgrades and replacement of a 7 mile long portion of fiber backbone, 14 miles of chain link fence replacement, and large tree relocations.
<br />Key Staff (Role) involved in the project as proposed for City of Sunny Isles CEI: Ido Shimony, PE (Senior Project Engineer);
<br />Chris Charvat (Project Administrator); Humberto Pedroso (Contract Support Specialist) and Mehdi Amirpour (Sr Bridge Inspec-
<br />tor).
<br />Eller Drive and ICTF Overpass - I-595 to Port Everglades (Federal Funds), FDOT District 4, Broward County
<br />Reference: Donald VanWhervin, PE, 954.958.7654, Donald.VanWhervin@dot.state.fl.us
<br />5548 NW 9th Avenue, Fort Lauderdale, FL 33309
<br />Construction Cost: $42.5M
<br />3/2011 to 4/2016
<br />Eisman & Russo provided Construction Engineering and Inspection (CEI) Ser-
<br />vices for the multi-award winning $42.5M interchange and new roadway/bridges;
<br />including curved steel plate girder, Florida Bulb-T’s and AASHTO Type 3 bridges,
<br />18 MSE walls, critical walls, concrete piles and steel H piles, bridge demolition,
<br />major earthwork construction, subsoil excavation, geogrid, mainline railroad
<br />track installation, turnout and intersection construction, drainage, a mile of water
<br />mains, large diameter pipe culvert, concrete pavement, pond construction, major
<br />utility relocations for water, force main, natural gas and jet fuel, groundwater and
<br />soil contamination and remediation, signalization, lighting, and landscaping.
|