Page 12 <br />TAB F: FIRM REFERENCES & SIMILAR WORK COMPLETED <br />RFQ: 20-07-01 Continuing Professional Services - Construction Engineering & Inspection (CEI) <br />FIRM REFERENCES & SIMILAR WORK COMPLETED <br />Eisman & Russo, Inc. (E&R) is extremely proud of our record of past professional accomplishments and ex- <br />perience in Construction Engineering & Inspection services. We have successfully completed hundreds of <br />CEI projects for the FDOT and Florida municipalities ranging from $2 million to upwards of $500 million in <br />construction value. <br />Our CEI culture is to take ownership of a project, be a catalyst for solutions, and exercise good professional <br />judgment making decisions and keeping the project moving; we are comfortable using the “Engineering” <br />in CEI. We embrace Contractor Engagement and Partnering as critical to success. We have a clear history of <br />partnering and being a catalyst to the construction process which can be evidenced on past projects by our <br />contractors achieving incentives, completing projects on time and on budget and having virtually no claims. <br />SR 821 Homestead Extension of Florida’s Turnpike (HEFT) Widening from SW 288 St to SW 216 St, Miami, FL, <br />Florida Turnpike Enterprise (FTE) <br />Reference: Karen Akers, PE, 954.934.1178, Karen.Akers@dot.state.fl.us <br />Mile Post 64, Pampano Beach Services Plaza, Pompano Beach, FL 33069 <br />Construction Cost: $70M <br />11/2015 to 2/2020 <br />Eisman & Russo provided Construction Engineering & Inspection (CEI) services for this $70M <br />Design Build widening project along the Homestead Extension of Florida’s Turnpike that included <br />8 miles of noise wall installations, median widening of 7 miles of roadway to accommodate addi- <br />tional capacity, roadway realignment, drainage and stormwater management system construction, <br />two bridge widenings, new roadway construction, and milling an resurfacing. A new tolling point <br />on the Turnpike was constructed as part of the project to replace an existing building and new <br />roadway alignment. <br />The project included safety improvements as well by replacing the high tension cable barrier <br />with guardrail and the addition of roadway lighting throughout the entire project limits which pre- <br />viously existed only at entry/exit interchanges. Other scope of work included new overhead sign <br />structures and ground mounted signs throughout, minor Intelligent Transportation System device <br />upgrades and replacement of a 7 mile long portion of fiber backbone, 14 miles of chain link fence replacement, and large tree relocations. <br />Key Staff (Role) involved in the project as proposed for City of Sunny Isles CEI: Ido Shimony, PE (Senior Project Engineer); <br />Chris Charvat (Project Administrator); Humberto Pedroso (Contract Support Specialist) and Mehdi Amirpour (Sr Bridge Inspec- <br />tor). <br />Eller Drive and ICTF Overpass - I-595 to Port Everglades (Federal Funds), FDOT District 4, Broward County <br />Reference: Donald VanWhervin, PE, 954.958.7654, Donald.VanWhervin@dot.state.fl.us <br />5548 NW 9th Avenue, Fort Lauderdale, FL 33309 <br />Construction Cost: $42.5M <br />3/2011 to 4/2016 <br />Eisman & Russo provided Construction Engineering and Inspection (CEI) Ser- <br />vices for the multi-award winning $42.5M interchange and new roadway/bridges; <br />including curved steel plate girder, Florida Bulb-T’s and AASHTO Type 3 bridges, <br />18 MSE walls, critical walls, concrete piles and steel H piles, bridge demolition, <br />major earthwork construction, subsoil excavation, geogrid, mainline railroad <br />track installation, turnout and intersection construction, drainage, a mile of water <br />mains, large diameter pipe culvert, concrete pavement, pond construction, major <br />utility relocations for water, force main, natural gas and jet fuel, groundwater and <br />soil contamination and remediation, signalization, lighting, and landscaping.