My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 20-08-01 City Landscaping Services (With Hyperlink to Option B)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(20-08-01) City Landscaping Services (With Hyperlink to Option B)
>
ITB 20-08-01 City Landscaping Services (With Hyperlink to Option B)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2020 3:59:37 PM
Creation date
8/27/2020 3:58:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br />City of Sunny Isles Beach | ITB 20-08-01 City Landscaping Services 73 <br /> <br />Proper removal and eradication of bee, wasp and hornet nests by a registered <br />beekeeper or trained Pest Control Operator. <br /> <br />I4 PREVENTIVE MOSQUITO CONTROL WITHIN CITY PARKS AND BEACH <br /> <br />This bid item includes fogging the City parks with a motorized cart and /or <br />backpack. Work to be completed overnight in the pre-dawn hours (exact times <br />to be determined by City) in a manner safe to the public. Avoid spraying when <br />residents are active. Contractor is to eliminate mosquito breeding sites by <br />removing standing water. Mosquito control shall be a supplemental service. <br /> <br />I5 DATE PALM FUNGICIDE TRUNK DRENCH <br /> <br />This bid item includes a top to bottom fungicide trunk drench utilizing T-Storm or <br />Cleary’s 3336 in the event that Thielvopsis paradoxa is identified in close <br />proximity to subject palms. <br /> <br />I6 DEEPROOT ROOT BARRIER <br /> Model #UB 24-2 <br /> This Bid item is to include the supplying, delivery and placement of DeepRoot <br /> Root barrier (or approved equal) in the locations designated by the City. <br /> <br /> I7 – I22 MISCELLANEOUS ITEMS CONTINUED <br /> <br /> (*Please note, the following line items pertain to disaster debris hauling, which will only <br /> be activated upon a notice to proceed after a declared emergency, these line items <br /> intentionally include ROW and Parks as part of the scope) <br /> <br />5.1.6.1 Emergency Push/Road Clearance <br />At the request of the City for this contract, work shall consist of all labor, equipment, fuel and <br />associated costs necessary to clear and remove debris from City roadways, to make them passable <br />immediately following a declared disaster event. All roadways designated by the City Debris <br />Manager shall be clear and passable within seventy (70) working hours of the issuance of Notice <br />to Proceed from the City to conduct emergency roadway clearance work. This may include <br />roadways under the jurisdiction of other governmental agencies under the legal responsibility of <br />the City. Clearance of these roadways will be performed as identified by the City Debris Manager. <br />The Contractor shall assist the City and its representatives in ensuring proper documentation of <br />emergency road clearance activities by documenting the type of equipment and/or labor utilized <br />(i.e., certification), starting and ending times, photos and descriptions, and zones/areas worked. <br />Services performed under this Contract element will be compensated using lines J6-J21 – <br />Hourly Labor and Equipment Price Schedule. <br />
The URL can be used to link to this page
Your browser does not support the video tag.