Laserfiche WebLink
4 <br /> <br />tabulation, as well as a beach access line item to Section D of Option B <br />tabulation. <br /> <br />(2). Section 3.9 and 1.11(Option B) Tree & Palm Maintenance <br /> <br />All pruning shall be in accordance with the American National Standards Institute ANSI A-300 <br />standards and practices. Tree maintenance must be under the direct supervision of an ISA certified <br />arborist. A tree maintenance schedule developed by an ISA certified arborist shall be provided to <br />the City in writing within (14) days after award of contract as part of the Maintenance and Service <br />Plan. An ISA certified arborist shall be available for tree health inspections, reports and tree <br />maintenance recommendations when requested by the City. <br /> <br /> (3) 3.19 PARKS LITTER/DEBRIS REMOVAL LITTER <br /> <br />The Contractor shall empty and dispose of contents of all trash containers in all beach access <br />paths once per day, seven days per week including all weekends and holidays. In addition, the <br />Contractor shall empty and dispose of contents of all trash containers (including fish guts) at the <br />Pier Park Fishing Pier twice once per day on Saturday and Sunday, including holidays, in the <br />morning between 7:00 am and 10:00 am and in the evening by 6:00 pm. All trash shall be <br />removed off-site daily, no dumpsters shall be stored within City limits, including fish <br />guts trash removal. <br /> <br />(4) 2.1.6 ROW D. BEACH ACCESS PATHS (See section D of the Bid Form) <br /> <br />Removal of all litter and debris shall be conducted once per day, 7 days a week only on <br />weekends and holidays. <br /> <br />(5) 2.1.6 ROW D. BEACH ACCESS PATHS (See section D of the Bid Form) <br /> <br /> D1 thru D19 D1- D20. <br /> <br />(6) Updated exhibits, with Beach Access locations will be issued next week <br />to reflect the changes made to Section D (OPTION B). Please use the <br />descriptions included in excel spreadsheet.