Laserfiche WebLink
complete this work. We will only assign the most seasoned and highly trained supervisors and <br />crew members to service your sites. Any new hires that may be required during the growing season <br />will be placed on other properties until fully trained not only in the operation of the equipment <br />used, but also in the safety guidelines. <br />It is our goal to provide the City of Sunny Isle with a worry -free contract and gain the trust that <br />our current customers already have in VisualScape. Once we take on a customer/property we take <br />ownership and provide a long-term partnership. Ultimately, we have the same Goal in mind keep <br />the manage a World Class Landscape while complying with all the horticultural and safety rules <br />and regulations and maintaining the original design intent of the landscape. <br />VisualScape will provide a total of 4 full-time landscape professional crews, one Contract <br />Manager, and one Production Manager which will be dedicated to performing services. All work <br />will be performed as specified in this ITN: <br />The crews' composition is as follows: <br />2 — 4 to 5 Man Full -Service Crews are responsible for Items "3.8 WEED CONTROL, 3.10 <br />SHRUB & GROUNDCOVER MAINTENANCE, 3.11 BUTTERFLY GARDEN <br />SPECIALIZED MAINTENANCE, 3.13 SOD MAINTENANCE / MOWING, 3.15 EDGING, <br />and 3.16 LINE TRIMMING." One crew will be assigned to the Parks and the other to the ROW. <br />Each crew will consist of. <br />1— English speaking, experienced, and professional Supervisor and 2 to 4 highly <br />trained Gardeners <br />1 — Pick-up Truck with dump bed <br />1 — Enclosed Trailer <br />1 —Riding Mowers <br />2 — Walk behind Mower <br />1 — Push Mower <br />2 — Edger <br />2 — Line Trimmers <br />4 — Blowers <br />1 — Street Blower <br />1 — Back Pack Sprayer <br />Trash cans, rakes, and other miscellaneous hand tools. <br />2 — 2 to 3 Man Litter Management Crews and 2 - 2 -man weekend crews are responsible for Items <br />"3.17 CATCH BASINS, 3.18 GRAFFITI REMOVAL, 3.19 LITTER/DEBRIS REMOVAL, <br />1.18 BUS SHELTER & BENCH LOCATIONS." One crew will be assigned to the Parks and the <br />other to the ROW. Each crew will consist of. <br />1 — English speaking, experienced, and professional Supervisor and 1 to 2 trained <br />Crew Members <br />1 —Pick-up Truck <br />1 —Utility terrain vehicle <br />1 — Street Blower <br />