Laserfiche WebLink
`pry OF SUN P' <br />1.5.2 The Contractor is responsible to have required FDOT certification for initiating, installing, <br />and maintaining all temporary traffic control devices within FDOT rights-of-way in <br />accordance with the latest FDOT standard specifications. <br />1.5.3 Due to construction projects within the City, FDOT may require that tree pruning be <br />completed at night. The Contractor is responsible to perform the work in accordance with <br />FDOT requirements at no additional cost to the City. <br />1.6 FORCE MA)EURE <br />If weather or other acts of nature prevents the Contractor from conducting the requested services <br />or maintenance on the day specified by the City or otherwise planned by the Contractor, the <br />Contractor shall conduct the services or maintenance requested on the following day at no <br />additional cost to the City (unless otherwise directed by the City). Any change in schedule due <br />to this section must be communicated to the Project Manager prior to the commencement of <br />work. This shall apply throughout this entire ITB. <br />1.7 IRRIGATION SYSTEM MAINTENANCE <br />The Contractor must be responsible for the complete management, operation and maintenance <br />of all irrigation systems. Within thirty (30) days of Contract execution, the Contractor must <br />complete an' assessment at no additional cost to the City to determine what repairs are required <br />at each Project Site to bring each Irrigation System to full operations. This assessment will <br />provide a detailed breakdown by Project Site of the repair work required and cost of repair. <br />Contractor will be responsible for each Irrigation system once it is fully operational. <br />All improved and existing areas must receive sufficient amounts of water to flower beds, turf and <br />landscaping, as necessary to present a uniform green color without browning or barren areas <br />resulting from lack of water. Any dead or under -developing plants shall be immediately replaced <br />by the Contractor at no cost to the City. <br />The Contractor, at his/her expense, will be responsible for the proper maintenance, replacement, <br />repair, or retro -fitting of all irrigation components. Contractor will be reimbursed for the purchase <br />of materials and equipment only, at actual cost to the Contractor. without mark-up, to maintain <br />the Irrigation System except where the repair or replacement results from damage caused by <br />the Contractor. Any damages resulting from accidents, vandalism, or an Act of God are <br />reimbursable to the Contractor on a materials basis only with proper documentation and approval <br />by the City. Any necessary repairs, other than routine irrigation head replacement must be <br />approved in writing by the City prior to start of work. Under no circumstances will the City <br />reimburse Contractor for mark-up on material cost. <br />All repairs to the system shall be identical to the original installation, unless approved otherwise <br />in advance by the City. If a change to the installation or material will result in lower future <br />maintenance costs, less frequent breakage, or an increase in public safety, the Contractor shall <br />request authorization, in writing, to make the change for the City. Replacement of system <br />City of Sunny Isles Beach I ITB 20-08-01 Right -of -Ways and Facilities Landscape Maintenance Services <br />