My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020 BV Original Bid Forms 1 - Option B
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(20-08-01) City Landscaping Services (With Hyperlink to Option B)
>
Responses
>
2020 BV Original Bid Forms 1 - Option B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 1:43:57 PM
Creation date
10/2/2020 1:41:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monthly: Turn system on with controllers and check program. Adjust program as <br />needed for seasons, new plantings, and weather conditions. Verify that <br />system is running 20 minutes on and 20 minutes off, per cycle, to prevent <br />'wethose' hydration (decrease leak rate). Suggested frequency of <br />watering (will vary based on rainfall) is 5 cycles per day/5 days per week <br />during dry season and 4 cycles per day/3 days per week during wet <br />season. Visually inspect valves, filters, and backflow preventers for <br />malfunction or damage and repair as needed. With system running, <br />visually inspect for PVC pipe breaks or 'wethose' needing repairs. Always <br />make repairs to all PVC or 'wethose' pipe after flushing the pipe. After <br />repairs are complete, turn the system on to verify that no additional work <br />is required. The Contractor shall also conduct meter readings to verify <br />viability of systems at least once per month <br />Quarterly: In addition to monthly maintenance schedule, open flush ports and let <br />water run a minimum of 3 minutes. Check filter elements for excess <br />residual and replace if needed. <br />Annually: In addition to monthly maintenance schedule, replace filter elements and <br />controller batteries. Chemically flush system using 'Dissolve' (this process <br />will remove iron, calcium, and other buildup on the inside of the'wethose' <br />and PVC pipe). <br />Accidental: Accidental damage to system — Follow the monthly procedure and be <br />mindful to always flush the system before and after making repairs. <br />1.7.4 CONVENTIONAL IRRIGATION SYSTEMS <br />Requirements for Conventional Irrigation Systems within project limits: The Contractor is <br />to familiarize himself with the existing irrigations systems and is responsible for the repair <br />of all components to insure a continually efficient irrigation system. This includes the <br />adjustment of the controllers to ensure the correct amount of precipitation necessary for <br />viable vegetative growth, always following any South Florida Water Management District <br />drought guidelines. Contractor is to perform monthly wet tests, or more frequently as <br />required by the City, to verify viability of system, on the last Wednesday of each month. <br />On the first day of each month report to City, in writing, indicating proper operation of <br />each zone, required repairs, additional costs and updated run time per zone. Contractor <br />shall ensure that all irrigation systems have 100% coverage with 50% overlap. <br />1.8 PESTICIDES AND FERTILIZERS <br />City of Sunny Isles Beach I ITB 20-08-01 Right -of -Ways and Facilities Landscape Maintenance Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.