Laserfiche WebLink
Q7. "It is our understanding that the minimum staffing set forth in Section 2.20.3 pertains to <br />Option A only and that there is not a separate minimum staffing requirement for Option B. Is <br />that correct?" <br />A7. Regarding Option B, one full set of personnel requirements listed ,, %JV%AJV„ c.cu or <br />Option A is required for Parks and a separate set of the same is required for Right of Ways <br />(if bidding on Option B). <br />None of the positions can be interchangeable, with the exception of Program Manager. We <br />would be willing to consider one Program Manager over both areas, if awarded Option B, but <br />your bid must make note that you are planning as such under exceptions and include a <br />narrative of how the Program Manager will effectively manage both areas. <br />08. Please confirm the mix approved that is used to disinfect all saws prior to trimming each <br />palm tree within the city <br />A9. ,, iueu uisintectant products are as follows: <br />1. Household Bleach (ex: Clorox): 25% solution (1 part bleach + 1 part water) <br />2. Pine oil cleaner: (ex. Pine -Sol): 25% solution (1 part bleach + 1 part water) <br />3. Rubbing alcohol: (70% isopropyl): 50% solution (1 part alcohol + 1 part water) <br />Refer to the following methods by IFAS/UFL for disinfecting palm pruning tools: <br />htt : /Sfvl.ifaq.ufl.PHI I/mor4in/s lifasufledu/baker/docs/ df/horticulture/Disc fectin Prunin To <br />olspdf <br />Q9. Are Beach Access Paths included in parks or ROW ITB. <br />A9. Beach Access are included in the vx-rJ-W b,(, <br />Q10. Does all approved work listed in "On -Demand" schedule of values (ie, mulch, flowers, <br />etc) need to be performed with labor that is in addition to full time maintenance team <br />Q11. Is pier park parking lot included in the itb? It is not depicted on any of the maps? <br />A.11. Pier Park Parking lot is included in the Parks section. <br />012. Does the arrow board and all MOT related signage need to be available in the city at all <br />times? <br />Al2. No, but we would expect this to be available and on site in a timely manner for any <br />approved and scheduled projects. <br />013. Does the water tanker need to be available in the city at all times? <br />Al J. No, this would be requested under emergency or unique situations. <br />014. Will the questions deadline be extended since we haven't received the addendums that <br />may change scope, price, etc... <br />i- 1-4u, uw upenmg win not oe extended. <br />