My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2020-3099
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2020
>
Reso 2020-3099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2022 10:14:26 AM
Creation date
10/5/2020 10:19:09 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2020-3099
Date (mm/dd/yyyy)
09/17/2020
Description
Approve Grant Agmt w/FDOT 180 Street Pedestrian Overpass Bridge
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525-01040 <br />LOCAL AGENCY PROGRAM AGREEMENT PROGRAM MANAGEMENT <br />OGC - 12/18 <br />Page 1 of 1 <br />EXHIBIT "A" <br />PROJECT DESCRIPTION AND RESPONSIBILITIES <br />FPN: 441646-1-58-01 <br />This exhibit forms an integral part of the Local Agency Program Agreement between the State of Florida, Department of <br />Transportation and <br />Citv of Sunnv Isles Beach (the Reci <br />PROJECT LOCATION: <br />❑ The project is on the National Highway System. <br />® The project is on the State Highway System. <br />PROJECT LENGTH AND MILE POST LIMITS: Length 60 ft., 0.0136 miles, 15.4652 to 15.4788 <br />PROJECT DESCRIPTION: Pedestrian overpass across Collins Ave, SR AIA <br />SPECIAL CONSIDERATIONS BY RECIPIENT: <br />The Recipient is required to provide a copy of the design plans for the Department's review and approval to coordinate <br />permitting with the Department, and notify the Department prior to commencement of any right-of-way activities. <br />The Recipient shall commence the project's activities subsequent to the execution of this Agreement and shall perform in <br />accordance with the following schedule: <br />a) Study to be completed by Done <br />b) Design to be completed by 02/11/2021 <br />c) Right -of -Way requirements identified and provided to the Department by Done <br />d) Right -of -Way to be certified by Done <br />e) Construction contract to be let by 06/11/2021 <br />f) Construction to be completed by 03/30/2023 <br />If this schedule cannot be met, the Recipient will notify the Department in writing with a revised schedule or the project is <br />subject to the withdrawal of funding. <br />SPECIAL CONSIDERATIONS BY DEPARTMENT: <br />
The URL can be used to link to this page
Your browser does not support the video tag.