My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2020-3099
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2020
>
Reso 2020-3099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2022 10:14:26 AM
Creation date
10/5/2020 10:19:09 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2020-3099
Date (mm/dd/yyyy)
09/17/2020
Description
Approve Grant Agmt w/FDOT 180 Street Pedestrian Overpass Bridge
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525-010-40B <br />LOCAL AGENCY PROGRAM AGREEMENT PROGRAM MANG EMENT <br />OGC - 10/18 <br />Page 1 of 1 <br />EXHIBIT "B" <br />SCHEDULE OF FINANCIAL ASSISTANCE <br />RECIPIENT NAME & BILLING ADDRESS: FINANCIAL PROJECT NUMBER: 441646-1-58-01 <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, FL 33160 <br />COST ANALYSIS CERTIFICATION AS REQUIRED BY SECTION 216.3475, FLORIDA STATUTES: <br />I certify that the cost for each line item budget category has been evaluated and determined to be allowable, reasonable, and necessary as required by <br />Section 216.3475, F.S. Documentation is on file evidencing the methodology used and the conclusions reached. <br />Xiomara Nunez, MBA <br />District Grant Manager Name <br />Signature Date <br />MAXIMUM PARTICIPATION <br />(1) <br />PHASE OF WORK By Fiscal Year <br />TOTAL <br />PROJECT FUNDS <br />(2) <br />LOCAL FUNDS <br />(3) <br />STATE FUNDS <br />(4) <br />FEDERAL FUNDS <br />esign- Phase 38 <br />Y: (Insert Program Name) <br />$ <br />$ <br />$ <br />$ <br />Y: (Insert Program Name) <br />$ <br />$ <br />$ <br />$ <br />Y: Insert Program Name <br />$ <br />$ <br />$ <br />$ <br />Total Design Cost <br />$ o.00 <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />fight -of -Way- Phase 48 <br />Y: (Insert Program Name) <br />$ <br />$ <br />$ <br />$ <br />Y: (Insert Program Name) <br />$ <br />$ <br />$ <br />$ <br />Y: Insert Program Name <br />$ <br />$ <br />$ <br />$ <br />Total Right -of -Way Cost <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />onstruction- Phase 58 <br />Y-21 (IA) <br />$ 6 3gn,non on <br />$ 9 8sn,000 nn <br />$ <br />$ 500,000.00 <br />Y: (Insert Program Name) <br />$ <br />$ <br />$ <br />$ <br />Y: Insert Program Name <br />$ <br />$ <br />$ <br />$ <br />Total Construction Cost <br />$ 6,390,000.00 <br />$ 5,890,000.00 <br />$ 0.00 <br />$ 500,000.00 <br />onstruction Engineering and Inspection (CEI)- Phase 68 <br />Y-21 (TA) <br />$7100000 <br />$7100000n <br />$ <br />$ <br />Y: (Insert Program Na me\ <br />$ <br />$ <br />$ <br />$ <br />Y: <br />$ <br />$ <br />$ <br />$ <br />Total CEI Cost <br />$ 710,000.00 <br />$ 710,000.00 <br />$ 0.00 <br />$ 0.00 <br />Insert Phase) <br />Y: (Insert Program Name) <br />$ <br />$ <br />$ <br />$ <br />Y: (Insert Program Name) <br />$ <br />$ <br />$ <br />$ <br />Y: Insert Program Name <br />$ <br />$ <br />$ <br />$ <br />Total Phase Costs <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />TOTAL COST OF THE PROJECT <br />$ 7,100,000.00 <br />$ 6,600,000.00 <br />$ 0.00 <br />$ 500,000.00 <br />COST ANALYSIS CERTIFICATION AS REQUIRED BY SECTION 216.3475, FLORIDA STATUTES: <br />I certify that the cost for each line item budget category has been evaluated and determined to be allowable, reasonable, and necessary as required by <br />Section 216.3475, F.S. Documentation is on file evidencing the methodology used and the conclusions reached. <br />Xiomara Nunez, MBA <br />District Grant Manager Name <br />Signature Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.