My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2020-3126
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2020
>
Reso 2020-3126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 2:53:11 PM
Creation date
10/27/2020 12:08:56 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2020-3126
Date (mm/dd/yyyy)
10/15/2020
Description
Change Order No. 29 relating to the Agreement w/ Rohl for Collins Ave utilities undergrounding project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT: <br />Collins Avenue Utility Undergrounding <br />City of Sunny Isles Beach <br />18070 Collins Ave. <br />Sunny Isles Beach, FL 33160 <br />TO CONTRACTOR: <br />Rohl Global Networks LP <br />2875 Jupiter Park Dr. STE 900 <br />Jupiter, FL 33458 <br />Change Order Number: <br />29 <br />Date: <br />September 22, 2020 <br />Architect's Project Number: <br />15-12-02 <br />Contract Date: <br />February 18, 2016 <br />Contract For: <br />Collins Avenue Utility Undergrounding <br />The Contract is changed as follows: Change Order for additional items as described below: <br />Extend General Conditions/MOT 1 — Month @ $22,750.00 = 22,750.00, 1 — Month @ <br />$35,000.00 = $35,000.00 and 2 — Months @ $57,750.00 = $115,500.00 <br />$173,250.00 <br />Modify FPL Easement and Equipment layout at Sahara Condo — ALLOWANCE <br />$35,000.00 <br />Refurbish streetlights removed from Northwest end of Collins -7 X $3,000. <br />$21,000.00 <br />Density Testing at spread footer locations per FDOT requirements — ALLOWANCE <br />$45,000.00 <br />Additional fixtures for extended project limits - 14 luminaires @ $3,158.00 <br />14 X $3,158.00 = $44,212.00, 10 poles @ $8,040.00 10 X $8,040.00 = $80,400. <br />$124,612.00 <br />Additional Spread footing for extended project limits 3 X 11,500.00 = $34,500.00 <br />9 X $14,000.00 = $126,000 <br />$160,500.00 <br />Additional conduit and wire for extended project limits and traffic signals <br />$85,000.00 <br />Additional 120Volt transformers for extended project limits 18 x $1492.54 <br />$26,865.72 <br />Three additional complete streetlight assemblies for reserve 3 X $11,198.00 <br />$33,594.00 <br />Police Detail rate increase, additional details required by FDOT <br />$44,472.00 <br />Upgraded spread footings per FDOT requirements 11 X $2,500.00 <br />$27,500.00 <br />Additional Unforeseen obstructions — ALLOWANCE <br />$80,000.00 <br />5% Contingency on non allowance items <br />$34,839.69 <br />TOTAL CHANGE ORDER <br />$891,633.41 <br />Increase PO issued by the City of Sunny Isles Beach to RGN contract as follows: <br />The original contract sum was: $6,8309000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.