Laserfiche WebLink
The net change by previously authorized Change Orders: <br />11,734,345.96 <br />The Contract Sum prior to this Change Order was: <br />$18,564,345.96 <br />The Contract Sum will be increased by this Change Order in the amount of <br />$891,633.41 <br />The new Contract Sum, including this Change Order, will be: <br />$19,455,979.37 <br />The Contract Time will be increased by: <br />92 Days <br />Therefore, the date of Substantial Completion as of the date of this Change Order is: <br />December 31, 2020 <br />NOT VALID UNTIL SIGNED BY THE ENGINEER, CONTRACTOR AND OWNER. <br />ENGINEER CONTRACTOR OWNER <br />Chad Szklaruk PT Abbott <br />SIGNATURE <br />SIGNATURE SIGNATURE <br />PRINTED NAME Chad Szklaruk Paul T Abbott <br />PRINTED NAME PRINTED NAME <br />DATE Sept. 22,2020 Sept. 22 2020 <br />DATE DATE <br />