My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid 20-09-01 Golden Shores Street Lighting Bid Package
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(20-09-01) Golden Shores Street Lighting
>
Bid 20-09-01 Golden Shores Street Lighting Bid Package
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 10:01:53 AM
Creation date
10/28/2020 9:27:21 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Street Lighting
Bid No. (xx-xx-xx)
20-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />City of Sunny Isles Beach |Invitation to Bid No. 20-09-01 11 <br /> <br />2.6 METHOD OF AWARD <br /> <br />Following the review of bids, the lowest responsible, responsive bidder(s) meeting all terms, <br />conditions, and specifications of the ITB shall be recommended for award either by bid item, bid <br />group, or for the entirety of all bid items, as deemed in the best interest of the City. The City <br />Manager may also reject all proposals received. In determining the lowest responsible, responsive <br />bidder, and in addition to price, section 62-8 of the City Code provides that the City may consider <br />the following: <br /> <br /> The ability, capacity and skill of the bidder to perform the Contract. <br /> Whether the bidder can perform the Contract within the time specified, without delay or <br />interference. <br /> The character, integrity, reputation, judgment, experience and efficiency of the bidder. <br /> The quality of performance of previous contracts with the City and references. <br /> The previous and existing compliance by the bidder with laws and ordinances relating to <br />the Contract. <br /> <br /> The City reserves the right in the event the primary vendor cannot provide an item(s) or <br /> service(s) in a timely manner as requested, to award to a secondary vendor without violating <br /> the intent of this ITB or any Contract awarded. <br /> <br />2.7 SUB-CONTRACTORS: <br /> <br />If one or more subcontractors are to be used, the subcontractor must be clearly identified and <br />noted in the submittal when it is submitted. The City must approve any changes in the use of <br />subcontractors in advance and in writing. No such approval will be construed as making the City a <br />party to such subcontract, or subjecting the City to liability of any kind to any subcontractor. No <br />subcontractor will under any circumstances relieve the Respondent of its liability and obligation <br />under any resulting contract. Subcontractor is subject to the same contractual conditions as is the <br />Respondent. <br /> <br />The Engineer shall promptly notify the Contractor, in writing, if either the Owner or Engineer, after <br />due investigation, has reasonable objections to any subcontractor on said list and does not accept <br />them. Failure of the Owner or Engineer to make objection to any subcontractor on the list shall <br />constitute acceptance of such subcontractor. After acceptance, no subcontractor shall be changed <br />without written approval by the Owner and Engineer. <br /> <br />2.8 BID <br /> <br />If the vendor is awarded a contract under this solicitation, the prices proposed by the vendor shall <br />remain fixed and firm during the term of the contract. <br /> <br />2.9 BID BOND <br />The City of Sunny Isles Beach shall require that every Proposer furnish a Bid Bond in the amount
The URL can be used to link to this page
Your browser does not support the video tag.