My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid 20-09-01 Golden Shores Street Lighting Bid Package
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(20-09-01) Golden Shores Street Lighting
>
Bid 20-09-01 Golden Shores Street Lighting Bid Package
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 10:01:53 AM
Creation date
10/28/2020 9:27:21 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Street Lighting
Bid No. (xx-xx-xx)
20-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />City of Sunny Isles Beach |Invitation to Bid No. 20-09-01 15 <br /> <br />2.15 PURCHASE OF OTHER ITEMS NOT LISTED WITHIN THIS SOLICITATION <br />BASED ON PRICE QUOTES: <br /> <br /> (section not applicable) <br /> <br />2.16 SAMPLES MAY BE REQUIRED DURING EVALUATION <br /> <br />After the City opens the Bids, bidders may be required to submit a representative sample for the <br />goods to be supplied for evaluation by, and at no cost to the City. <br /> <br />On the basis of this analysis, the City shall be sole judge of the acceptability of the sample in <br />conformance with the bid specifications and its decision shall be final. Any sample submitted <br />shall create an express warranty that the whole of the goods and/or services to be provided by <br />the bidder during the contract period shall conform to the sample submitted. The bidder <br />shall be required to provide adequate restitution to the City, in the manner prescribed by <br />the City, if this warranty is violated during the term of the contract. <br /> <br />2.17 CORRECTION OR REMOVAL OF DEFECTIVE WORK <br /> <br />If required by City, Contractor shall promptly, as directed and at its sole expense, either correct all <br />defective Work, whether or not fabricated, installed or completed, or, if the Work has been rejected <br />by City, remove it from the site and replace it with non-defective Work. Contractor shall bear all <br />direct, indirect and consequential costs of such correction or removal (including but not limited to <br />fees and charges of engineers, architects, attorneys and other professionals) made necessary <br />thereby. <br /> <br />2.18 CHANGE ORDER <br /> <br /> The Contract may only be changed by a Change Order approved by the City. Any <br /> increase or decrease in the Contract Price or adjustment in the Contract Time shall be based <br /> on written notice by the Contractor delivered promptly to the City (but in no event later than <br /> seven (7) days) after the acknowledgement or occurrence of the event giving rise to the claim <br /> and stating the general nature of the claim. Within fourteen (14) days thereafter, notice of the <br /> amount of the claim with all supporting data shall cover all amounts (direct, indirect and <br /> consequential) to which the claimant is entitled as a result of the occurrence of said event. All <br /> claims for adjustment in the Contract Price or Contract Time shall be determined by the City. <br /> <br /> The value of any Work covered by a Change Order or of any claim for an increase or <br /> decrease in the Contract Price or Contract Time shall be determined by: 1) mutual <br /> acceptance of a lump sum (which may include an allowance for overhead and profit) or 2) by <br /> application of unit prices contained in the Contract Documents to the quantities of the items <br /> involved. The City shall decide, in its sole discretion, whether to issue and agree to a Change <br /> Order, and verbal representations or instructions may not be relied upon by the Contractor. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.