My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Golden Shores Utility Underground Specs
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(20-09-01) Golden Shores Street Lighting
>
Golden Shores Utility Underground Specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 9:39:02 AM
Creation date
10/28/2020 9:38:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CTA Project No. 19-0035-001-01 16110-9 Golden Shores Street Lighting <br />October 12, 2020 SIB Bid No. 20-09-01 <br />K. Backfill: <br />1. Do not backfill until inspected by ENGINEER. <br />3.12 MANHOLES <br />A. Excavate, shore, brace, backfill, and final grade back to original state. <br />B. Do not install until final raceway grading has been determined. <br />C. Install such that raceways enter at nearly right angles and as near a s possible to one <br />end of wall, unless otherwise shown. <br />D. Grounding: As specified in Section 16450, GROUNDING. <br />E. Identification: Field stamp covers with manhole or handhole number as shown. Stamped <br />numbers to be 1-inch minimum height. <br />3.13 EMPTY RACEWAYS <br />A. Provide permanent, removable cap over each end. <br />B. Provide PVC plug with pull tab for underground raceways with end bells. <br />C. Provide nylon pull cord. <br />D. Identify, as specified in Paragraph IDENTIFICATION DEVICES, with waterproof tags <br />attached to pull cord at each end, and at intermediate pull point. <br />3.14 IDENTIFICATION DEVICES <br />A. Warning Tape: Install approximately 12 inches above underground or concrete - <br />encased raceways. Align parallel to, and within 12 i nches of, centerline of runs. <br />3.15 PROTECTION OF INSTALLED WORK <br />A. Protect products from effects of moisture, corrosion, and physical damage during <br />construction. <br />B. Provide and maintain manufactured watertight and dust -tight seals over all conduit <br />openings during construction. <br />C. Touch up painted conduit threads after assembly to cover nicks or scars. <br />- END OF SECTION -
The URL can be used to link to this page
Your browser does not support the video tag.