My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 20-09-01 - Mandatory Pre-Bid Minutes
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(20-09-01) Golden Shores Street Lighting
>
ITB 20-09-01 - Mandatory Pre-Bid Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 4:06:41 PM
Creation date
10/28/2020 1:50:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
ITB Golden Shores Street Lighting
Bid No. (xx-xx-xx)
20-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach <br />Minutes for ITB No. 20-09-01 <br />Golden Shores Street Lighting <br />18070 Collins Avenue, 1st Floor, Sunny Isles Beach, FL 33160 <br />Mandatory Pre-Bid Conference: Tuesday, October 27, 2020 at 11:00a.m. <br /> <br /> <br />PRESENT: Christopher J. Russo, City Manager <br /> Susan Simpson, Assistant City Manager <br />Paul Abbott, Consultant, HPF Associates, Inc. <br />Tim Hall, Engineering Consulting Services, Craven Thompson & Assoc., Inc. <br />Genesis Cuevas, Purchasing Agent <br /> Marline PierreSaint, Assistant City Clerk <br /> <br />Audience: Interested Parties <br /> Sign in sheet (attached) <br /> <br />11:05am <br />Introduction: <br /> <br />PAUL: <br />• Explanation of map <br />o Yellow/red dots concentrating where equipment is planned/tight knit, narrow, <br />single Family Street. <br />• Bid plans are exactly how they are <br />• Addendum will be published by Thursday, Oct. 29th <br />• Take to Commission next Commission meeting on Thursday, Nov. 20th <br />• Along Collins completed and moving to Golden Shores <br />o trench dig in asphalt – yet to come <br />o 48 existing FPL lights within community needs to stay active throughout life <br />• New lights up/new service points <br />o Successful contractor will be responsible for taking down, but needs to stay <br />functioning until new lights are up <br />• Working rules <br />o 8 a.m. earliest (single family residential) <br />o Daylight savings: to 6 p.m./sunset <br />o No working after dark <br />o End at 4 p.m. on Fridays, equipment off streets <br />• Staging Area <br />o 186th and Collins <br />o Larger items stored under Lehman William, 192nd Street <br />• Permits <br />o Job not permitted, city reviewing plans/no permit fees & costs <br />• Craven Thompson and HPF Assoc. will inspect project <br />• Maintenance of traffic is crucial <br />o Police required if street is blocked from thru traffic <br />• Contractor to include potential cost for details in bid based on how they manage project <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.