My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 20-09-01 - Mandatory Pre-Bid Minutes
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(20-09-01) Golden Shores Street Lighting
>
ITB 20-09-01 - Mandatory Pre-Bid Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 4:06:41 PM
Creation date
10/28/2020 1:50:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
ITB Golden Shores Street Lighting
Bid No. (xx-xx-xx)
20-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />• Never interfere with resident’s access to home <br />o Have steel plates available to cover a trench if necessary – to allow access to <br />neighborhood as needed <br />o Sandra Block, from police, will manage all details <br />o Prefer to use City police but (3) other cities assist: Golden Beach, Bay Harbor, & <br />Indian Creek. <br />o Available on website for charges, or reach out to City Clerk, Mauricio Betancur <br />• 1 Addendum for this process <br />o Revised bid form <br />o Line item: value engineering not to be included in base bid/but interject value <br />engineering into it <br />o Represent to City what value engineering idea you have - materials, means & <br />method etc. <br />• Sealed separate envelope, included in bid for value engineering <br />• Allowance <br />o Contingency set amount, not based on % of construction, need City’s approval <br />first <br />o Service points – overhead power to undergrounding – there may be an alternate to <br />service point construction <br />• Line item: spread footing <br />o Will be presented in Addendum, understand unit price for spread footing <br />o Bid to include sales tax <br />o Utilize direct Purchase Order process to release tax savings <br />o Administer cost impact <br />o Addendum will include bidder’s lists, minutes with directions <br />• Schedule (if need to pick-up 6th day) <br />o If need to work to meet schedule on Saturdays, need to request from City, have to <br />have permission first <br />o Cannot be holidays or other events that may be going on in the City <br />TIM: Ask if we defined the schedule? <br />PAUL: No we did not. <br />• Once awarded and delivery of fixtures & lights is confirmed a schedule will be required <br />from successful bidder, contract time will be “of the essence” <br />o Conduit, boxes, decorative fixtures, are many weeks away <br />o Start layout, identify & confirm right-of-way <br />o The City will not set control points <br />o Adamant about maintaining field red line – as built conditions - all of installations
The URL can be used to link to this page
Your browser does not support the video tag.