Laserfiche WebLink
Q: Alternative poles? <br />A: To be submitted as Value Engineering suggestions Bidder to provide more details. <br /> <br />Q: Service goes back to alley? <br />A: Go to rear of, Paul will handle FPL, work great w/ ppl from FPL. <br /> <br />Q: New light poles do not have to come from specific brand? (Luminaire) etc.? <br />A: Meeting details on plans. <br /> <br />Q: Is wind load requirement 175 mph calculation? <br />A: Correct. <br /> <br />Q: Bid on specification? <br />A: Multiple manufacturers on poles, needs to meet standard of specifications. <br /> <br />GENESIS: Please remember: <br />• Submit bid questions to Mauricio Betancur, City Clerk, tomorrow, by 5pm <br />• Addendum by Thursday On-Demand Star <br />• Be certain Submission is signed <br />• Pg. 29 Addendum <br />• Proof of insurance/bonds <br />• Add Bid Proposal cost numbers electronically (typed) (easier to read) <br />• Section 4, Response format provide (1) original, (4) copies and (1) <br />electronic copy (USB or CD) <br />• (3) references <br />• Bring Bids to 4th floor, Bid Opening is Tuesday, November 10, 2020, 1st <br />floor <br />• Supporting documents & qualifications <br />• Indicate exceptions <br />• Affidavit signed <br />• Follow the instructions on Section 4.0, Bid Response Format, in efforts to <br />have a responsive bid upon review. <br />• Not going to extend bid date <br />• Sub list & minutes will be on Addendum <br /> <br /> <br />THANK YOU ALL! <br />