My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment B SIB Pedestrian Park Bridge Feasibility Study v1f w Appendix.._ (4)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Attachment B SIB Pedestrian Park Bridge Feasibility Study v1f w Appendix.._ (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2020 4:31:09 PM
Creation date
11/6/2020 4:30:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WEEKEND PEAK HOUR <br />TURNING MOVEMENT EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />RAW COUNTS 87 0 182 0 0 0 127 1181 0 0 1156 77 <br />PSCF 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 <br />ADJUSTED EXISTING VOLUMES 100 0 209 0 0 0 146 1358 0 0 1329 89 <br />TURNING MOVEMENT EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />RAW COUNTS 80 0 149 0 0 0 155 1353 0 0 1475 79 <br />PSCF 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 <br />ADJUSTED EXISTING VOLUMES 92 0 171 0 0 0 178 1556 0 0 1696 91 <br />TURNING MOVEMENT EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />RAW COUNTS 78 0 145 0 0 0 126 1454 0 0 1431 80 <br />PSCF 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 <br />ADJUSTED EXISTING VOLUMES 90 0 167 0 0 0 145 1672 0 0 1646 92 <br />TURNING MOVEMENT COUNTS (PM PEAK)COLLINS AVE & 174th STREETTURNING MOVEMENT COUNTS (AM PEAK)COLLINS AVE & 174th STREETTURNING MOVEMENT COUNTS (MID-DAY PEAK)COLLINS AVE & 174th STREETCOLLINS AVENUE 174th STREET <br />APPENDIX G - ADJUSTED PEAK VOLUMES <br />G - 3
The URL can be used to link to this page
Your browser does not support the video tag.