My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment B SIB Pedestrian Park Bridge Feasibility Study v1f w Appendix.._ (4)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Attachment B SIB Pedestrian Park Bridge Feasibility Study v1f w Appendix.._ (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2020 4:31:09 PM
Creation date
11/6/2020 4:30:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WEEKDAY PEAK HOUR <br />TURNING MOVEMENT EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />RAW COUNTS 128 0 249 0 0 0 159 1511 0 0 1843 60 <br />PSCF 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 <br />ADJUSTED EXISTING VOLUMES 147 0 286 0 0 0 183 1738 0 0 2119 69 <br />TURNING MOVEMENT EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />RAW COUNTS 88 0 216 0 0 0 224 1970 0 0 1784 86 <br />PSCF 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 <br />ADJUSTED EXISTING VOLUMES 101 0 248 0 0 0 258 2266 0 0 2052 99COLLINS AVE & 174th STREETTURNING MOVEMENT COUNTS (AM PEAK) <br />TURNING MOVEMENT COUNTS (PM PEAK)COLLINS AVE & 174th STREETCOLLINS AVENUE 174th STREET <br />APPENDIX G - ADJUSTED PEAK VOLUMES <br />G - 2
The URL can be used to link to this page
Your browser does not support the video tag.