My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finley Engineering Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
Finley Engineering Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 10:40:06 AM
Creation date
11/23/2020 10:38:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ No. 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA <br />City of Sunny Isles Beach <br />114| <br />KEY PERSONNEL AND THEIR PROPOSED ROLES <br />Jerry M. Pfuntner, P.E., S.E. will be the Project Manager and the principal point of contact. He brings 26 years of experience <br />in complex bridge design and construction engineering, and familiarity with the Department’s standards and procedures, <br />proven by his experience as former FDOT – D6 Area Structural Engineer. Jerry has lead the design of the four precast <br />segmental bridges on the Palmetto Section 5 SR-826/SR-836 Interchange in Miami, the steel box flyover Ramps B, C, and <br />the widening of the existing bridge over the Miami Canal on the SR25/Okeechobee Rd & SR826/Palmetto Expressway <br />Interchange Improvement Project in Miami, and the three signature cast in place segmental bridges on the Wekiva <br />Parkway Section 6 in Sorrento, FL. Jerry will be assisted by the following key professionals. Patrick R. Noble, P.E., S.E. (8 <br />yrs. - FINLEY) Lead Bridge Engineer, will bring his experience as FINLEY Project Manager on the SR25/Okeechobee Rd & <br />SR826/Palmetto Expressway Interchange Improvement Project in Miami. Maxim D. Nasab, AIA, NCARB (9 yrs. - FINLEY), <br />Bridge Architect, brings his expertise and experience on bridge architecture to ensure that the project architecture and <br />aesthetics will meet the required and desired results. Enrique “Rick” Espino, P.E. (53 yrs. - FINLEY), Cost Estimating and <br />Schedule. Carmine Borea, P.E. (10 yrs. - FINLEY) Project Liaison. Jeff Easley, P.E. (34 yrs. - Hanson), Roadway Engineer. <br />Mark R. Sowers, PSM, SUE (37 yrs. - M.G. Vera) Surveyor. Hernando R. Ramos, P.E. (35 yrs. - HRES) Geotechnical Engineer. <br />Tammy Cook-Weedon, ASLA, PLA (33 yrs. - CGA) Landscape Architect. Donald Wilkin, RA, CPTED (36 yrs. - FINLEY) Project <br />Architect. Cathy Tiedge, PE (31 yrs. - TLC) Structural Engineer. Vincent McNish, PE (28 yrs. - TLC) MEP Engineer. Craig Finley, <br />P.E. (40 yrs. - FINLEY) QA/QC Bridge Structure. Brian Lemieux, PE (22 yrs. - Hanson) QA/QC Roadway / Traffic. Adolfo J. <br />Cotilla, Jr., AIA (40 yrs. - ACAI) QA/QC Architecture. <br />EQUALIFICATION INFORMATION & ASSIGNED PERSONNEL <br />We Bring... <br />A Proven Team currently working on the final design of one of the most <br />complicated FDOT interchange in Miami <br />Knowledge of the Project and familiarity with the City of Sunny Isles Beach <br />A Project Manager with 25 years of experience in Complex Bridge Design with <br />extensive knowledge of the FDOT Bridge Design Standards and familiarity with <br />FDOT approval process <br />A Bridge Architect to ensure that the project architecture and aesthetics will <br />meet the required and desired results <br />A Roadway Lead with extensive FDOT experience and comprehensive <br />understanding of traffic operations in South Florida
The URL can be used to link to this page
Your browser does not support the video tag.