|
RFQ No. 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA
<br />City of Sunny Isles Beach
<br />|67
<br />QUALIFICATION INFORMATION & ASSIGNED PERSONNEL
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THE CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS PROJECT 14. YEARS EXPERIENCE
<br />HERNANDO R. RAMOS, PE Geotechnical Engineer
<br />a. TOTAL b. WITH CURRENT FIRM
<br />35 22
<br />15. FIRM NAME AND LOCATION (City and State)
<br />HR Engineering Services, Inc.
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />BS Civil Engineering- U. of Cartagena- Colombia
<br />MS Civil Engineering- FIU, Miami
<br />MS Civil Engineering- Georgia Tech- Atlanta
<br />Professional Engineering- Florida 42045
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Expertise includes design, planning, execution of new geotechnical projects and the remedial procedures to correct foundation
<br />problems of existing structures, extensive involvement with axial and lateral pile analyses, slope stability evaluation on retaining
<br />walls and embankment projects using geosynthetic reinforcement. Other specialties include design of numerous retaining walls
<br />types such as mechanically stabilized earth, reinforced concrete, sheet pile cantilever and anchored walls.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />SR 826/SR 836 Palmetto Expwy/ Dolphin Expwy Interchange Com-
<br />plex/ FDOT, D6 Design Build
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2008 2015
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Reconstruction of entire Interchange, including 46 new bridges (4 of them are segmental bridges), embankments, MSE Walls and Miscellaneous structures.
<br />Provided all the final exploration and geotechnical design of the project. Performed dynamic pile load testing (PDA) and verification testing for the project,
<br />providing pile lengths and driving criteria. In addition, performing CSL testing on miscellaneous shafts and PIT on driven piles.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />SR 826/I-75 Express Lanes, from South of SR 836 to NW 170th Street,
<br />D6 Design Build
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2013 N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Providing all the final field exploration and geotechnical design of the project. The construction of the express lanes includes the widening of all existing
<br />bridges, from north of NW 25th Street to NW 138th Street, construction of the new bridge connecting the express lanes from SR 826 to I-75 and two new 2
<br />span bridges over SR 924 Ramps. The project also includes the design and construction of a new anchored bulkhead along Peter’s Pike Canal, from north of
<br />NW 103rd Street to I-75 South Ramp to SR 826 to help accommodate the widening of SR 826 and Miscellaneous sign and gantry toll structures.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />SR 5/ US-1 Interchange at NE 203rd Street – FPID No. 433511-1-22-01 -
<br />Miami-Dade County, Florida.
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2015 2019
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Providing all the final field exploration and geotechnical design of the project. The project consisted of roadway improvements, construction of lanes
<br />widening, drainage improvements, milling and resurfacing, the widening of existing bridge structures, construction of new bridge structures, including a new
<br />pedestrian bridge over FEC Rail road, retaining walls and connector ramps for the SR 5/US 1 Interchange at NE 203rd Street in Miami-Dade County, Florida.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />SR 826/ Palmetto Expressway, Segment 6 – From East of NW 32nd
<br />Avenue to west of NW 17th Avenue– FPID No. 435760-6-52-01 - Mi-
<br />ami-Dade County, Florida.
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2016 2019
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Provided all the final field exploration and geotechnical services for the project. The project consisted of the improvement of SR 826 Palmetto Expressway,
<br />from east of NW 32nd Avenue to west of NW 17th Avenue in Miami-Dade County, Florida. The work consists of roadway improvements including roadway
<br />reconstruction, drainage improvements, milling and resurfacing, replacement of existing bridge structures over NW 27th and NW 32nd Avenue, the
<br />construction of a new pedestrian bridge over SR 826, and new retaining walls.
<br />E
|