Laserfiche WebLink
RFQ No. 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA <br />City of Sunny Isles Beach <br />|67 <br />QUALIFICATION INFORMATION & ASSIGNED PERSONNEL <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THE CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS PROJECT 14. YEARS EXPERIENCE <br />HERNANDO R. RAMOS, PE Geotechnical Engineer <br />a. TOTAL b. WITH CURRENT FIRM <br />35 22 <br />15. FIRM NAME AND LOCATION (City and State) <br />HR Engineering Services, Inc. <br />16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />BS Civil Engineering- U. of Cartagena- Colombia <br />MS Civil Engineering- FIU, Miami <br />MS Civil Engineering- Georgia Tech- Atlanta <br />Professional Engineering- Florida 42045 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Expertise includes design, planning, execution of new geotechnical projects and the remedial procedures to correct foundation <br />problems of existing structures, extensive involvement with axial and lateral pile analyses, slope stability evaluation on retaining <br />walls and embankment projects using geosynthetic reinforcement. Other specialties include design of numerous retaining walls <br />types such as mechanically stabilized earth, reinforced concrete, sheet pile cantilever and anchored walls. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />SR 826/SR 836 Palmetto Expwy/ Dolphin Expwy Interchange Com- <br />plex/ FDOT, D6 Design Build <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2008 2015 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Reconstruction of entire Interchange, including 46 new bridges (4 of them are segmental bridges), embankments, MSE Walls and Miscellaneous structures. <br />Provided all the final exploration and geotechnical design of the project. Performed dynamic pile load testing (PDA) and verification testing for the project, <br />providing pile lengths and driving criteria. In addition, performing CSL testing on miscellaneous shafts and PIT on driven piles. <br />b. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />SR 826/I-75 Express Lanes, from South of SR 836 to NW 170th Street, <br />D6 Design Build <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2013 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Providing all the final field exploration and geotechnical design of the project. The construction of the express lanes includes the widening of all existing <br />bridges, from north of NW 25th Street to NW 138th Street, construction of the new bridge connecting the express lanes from SR 826 to I-75 and two new 2 <br />span bridges over SR 924 Ramps. The project also includes the design and construction of a new anchored bulkhead along Peter’s Pike Canal, from north of <br />NW 103rd Street to I-75 South Ramp to SR 826 to help accommodate the widening of SR 826 and Miscellaneous sign and gantry toll structures. <br />c. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />SR 5/ US-1 Interchange at NE 203rd Street – FPID No. 433511-1-22-01 - <br />Miami-Dade County, Florida. <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2015 2019 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Providing all the final field exploration and geotechnical design of the project. The project consisted of roadway improvements, construction of lanes <br />widening, drainage improvements, milling and resurfacing, the widening of existing bridge structures, construction of new bridge structures, including a new <br />pedestrian bridge over FEC Rail road, retaining walls and connector ramps for the SR 5/US 1 Interchange at NE 203rd Street in Miami-Dade County, Florida. <br />d. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />SR 826/ Palmetto Expressway, Segment 6 – From East of NW 32nd <br />Avenue to west of NW 17th Avenue– FPID No. 435760-6-52-01 - Mi- <br />ami-Dade County, Florida. <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2016 2019 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Provided all the final field exploration and geotechnical services for the project. The project consisted of the improvement of SR 826 Palmetto Expressway, <br />from east of NW 32nd Avenue to west of NW 17th Avenue in Miami-Dade County, Florida. The work consists of roadway improvements including roadway <br />reconstruction, drainage improvements, milling and resurfacing, replacement of existing bridge structures over NW 27th and NW 32nd Avenue, the <br />construction of a new pedestrian bridge over SR 826, and new retaining walls. <br />E