Laserfiche WebLink
RFQ No. 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA <br />City of Sunny Isles Beach <br />68| <br />QUALIFICATION INFORMATION & ASSIGNED PERSONNEL <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THE CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS PROJECT 14. YEARS EXPERIENCE <br />CATHY G. TIEDGE, PE, LEED AP <br />BD+C Structural Engineer <br />a. TOTAL b. WITH CURRENT FIRM <br />31 5 <br />15. FIRM NAME AND LOCATION (City and State) <br />TLC Engineering Solutions, Inc. – Cocoa, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />University of Central Florida <br />B.S., Civil Engineering with Structural Emphasis, 1989 <br />Structural Engineer: FL #47763 (PE Other States: AR, CO, DE, GA, IA, <br />IN, MD, MS, NC, NV, PA, SC, TN, TX, VA, WI) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Cathy has 30 years of experience providing structural design for expansion, renovation, and adaptive reuse projects. Her project <br />experience covers healthcare, justice, entertainment, and commercial projects across the country. She is technically proficient <br />in all aspects of structural design. Cathy works closely with architects to develop structural solutions that fulfill the design vision. <br />Throughout the design life of a project, Cathy maintains involvement by monitoring progress and assisting in maintaining the <br />highest level of quality service. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Brevard County Pedestrian Bridge Demolition – Lift Station 21 Piping <br />Replacement, Melbourne, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2016 2016 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Structural Engineer. Structural design for replacing the existing gravity sewer piping involved in the demolition plan for the existing pedestrian bridge, and <br />structural design for foundations and new retaining wall that crosses the existing box culvert. <br />b. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Arthrex Administration Facility, Parking Garage & Pedestrian Bridge, <br />Naples, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2020 2020 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Structural Engineer. New administrative building is a six-story steel structure integrated around a six-level, 1500-space precast parking garage. The corporate <br />office complex features a multi-story atrium, cafe, roof gardens, and pedestrian bridge. $52.5 million / 300,000 sf <br />c. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Hypoluxo Road Retaining Wall Evaluation, Boca Raton, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2019 2019 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Structural Engineer. Visual inspection and condition evaluation of existing CMU retaining wall, which retains a 7 foot grade <br />difference, at the intersection of Hypoluxo Road and High Ridge Road. Report included recommendations for repair, <br />replacement, and/or maintenance of the existing structural elements. <br />d. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Cruise Terminal 5 Walkway Connector Bridge Port <br />Canaveral, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2016 2016 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Structural Engineer. Enclosing and expanding the existing pedestrian bridge was part of the $22 renovations to the cruise terminal and bridge. Also designed <br />foundation systems to accommodate revised lighting requirements, existing utilities, and surveyed site conditions for new elevated walkway connector <br />between CT5 parking garage and CT5 entrance. <br />e. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Victory Point Park, Clermont, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2013 2013 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Structural Engineer. Overlook structure, overlook tower, retaining walls and weir structures, vehicle bridge, civil / transportation / drainage features, 4000 sf <br />pavilion with office, restroom, open air pavilion and stage. 2019, AIA Florida, Best Small Project. 2019, ASLA Florida, Award of Honor. $9.5 million. <br />E