My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finley Engineering Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
Finley Engineering Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 10:40:06 AM
Creation date
11/23/2020 10:38:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ No. 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA <br />City of Sunny Isles Beach <br />|87 <br />QUALIFICATION INFORMATION & ASSIGNED PERSONNEL E <br /> STANDARD FORM 330 (Rev. 8/2016) PAGE 1 <br />ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) <br /> <br />PART II - GENERAL QUALIFICATIONS <br />(If a firm has branch offices, complete for each specific branch office seeking work.) <br />2a. FIRM (or Branch Office) NAME TLC Engineering Solutions, Inc. – South Florida Operations 3. YEAR ESTABLISHED 1955 4. UNIQUE ENTITY IDENTIFIER 05-488-8037 <br />2b. STREET <br />5757 Blue Lagoon Drive, Suite 400 5. OWNERSHIP <br />2c. CITY Miami <br />*also 800 Fairway Dr, Ste 250 Deerfield Beach, FL 33441 <br />2d. STATE FL 2e. ZIP <br />CODE 33126 <br />a. TYPE Corporation <br />6a. POINT OF CONTACT NAME AND TITLE Erick Gonzalez, PE, LEED AP, Principal / Regional Director b. SMALL BUSINESS STATUS N/A <br />6b. TELEPHONE NUMBER 305.266.6553 6c. E-MAIL ADDRESS erick.gonzalez@tlc-eng.com 7. NAME OF FIRM (If Block 2a is a Branch Office). TLC Engineering Solutions, Inc. <br /> 8a. FORMER FIRM NAME(S) (If any) 8b. YEAR ESTABLISHED 8c. UNIQUE ENTITY IDENTIFIER <br />Known as TLC Engineering Solutions, Inc. effective March 2019; previously known as TLC Engineering <br />for Architecture, Inc. TLC acquired Allan + Conrad in 2015, LaSalle Engineering in 2019 and Gage <br />Consulting Engineers in 2020. <br />1955 05-488-8037 <br />9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL <br />AVERAGE REVENUE FOR LAST 5 YEARS <br />a. Function <br />Code <br /> <br />b. Discipline <br />c. Number of Employees a. <br />Profile <br />Code <br /> <br />b. Experience <br />c. Revenue Index <br />Number <br />(see below) (1) FIRM (2) BRANCH <br />02 Administrative 63 4 A06 Airports; Terminals & Hangars 6 <br />08 CADD Technicians / Intern 20 3 A11 Auditoriums & Theaters 6 <br />13 Communications Engineer / Specialist / <br />Designer 20 C10 Commercial Bldg (low rise); <br />Shopping center 5 <br />14 Computer Operations / Network Manager 6 E02 Educational Facilities 7 <br />15 Construction Inspector 1 F02 Field Houses; Gyms; Stadiums 4 <br />21 Electrical Engineer / EI / Designer 104 9 G01 Garages; Vehicle Maintenance Facilities; Parking Decks 3 <br />25 Fire / Life Safety Engineer 2 H09 Hospital & Medical Facilities 9 <br />42 Mechanical Engineer / EI / Designer 150 14 H10 Hotels; Motels 6 <br />57 Structural Engineer / EI / Designer 24 H11 Housing 6 <br /> H12 Senior Living 5 <br /> PEs (included above) 105 9 I01 Industrial Buildings 4 <br /> RCDDs (included above) 6 J01 Judicial and Courtroom Facilities 4 <br /> LEED APs (included above) 76 11 L01 Laboratories; Medical Research <br />Facilities 4 <br /> CxAs (included above) 21 1 L04 Libraries; Museums; Galleries 4 <br /> O01 Office Buildings; Industrial Parks 6 <br /> P08 Prisons & Correctional Facilities 3 <br /> P13 Public Safety Facilities 4 <br /> R03 Railroad; Rapid Transit 4 <br /> R04 Recreation Facilities 4 <br /> <br /> Total 390 30 <br />11. ANNUAL AVERAGE PROFESSIONAL <br />SERVICES REVENUES OF FIRM <br />FOR LAST 3 YEARS <br />(Insert revenue index number shown at right) <br />PROFESSIONAL SERVICES REVENUE INDEX NUMBER <br /> <br />1. Less than $100,000 6. $2 million to less than $5 million <br />2. $100,000 to less than $250,000 7. $5 million to less than $10 million <br />3. $250,000 to less than $500,000 8. $10 million to less than $25 million <br />4. $500,000 to less than $1 million 9. $25 million to less than $50 million <br />5. $1 million to less than $2 million 10. $50 million or greater <br /> <br />a. Federal Work 5 <br />b. Non-Federal Work 10 <br />c. Total Work 10 <br />12. AUTHORIZED REPRESENTATIVE <br />The foregoing is a statement of facts. <br />a. SIGNATURE <br /> <br />b. DATE <br />March 31, 2020 <br />c. NAME AND TITLE <br />Erick Gonzalez, PE, LEED AP, Principal / Regional Director <br /> <br />RFQ No. 20-10-01
The URL can be used to link to this page
Your browser does not support the video tag.