My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finley Engineering Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
Finley Engineering Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 10:40:06 AM
Creation date
11/23/2020 10:38:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ No. 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA <br />City of Sunny Isles Beach <br />88| <br />FINLEY Engineering Group, Inc. <br /> Florida Department of Transportation <br />RON DESANTIS <br />GOVERNOR 605 Suwannee Street <br />Tallahassee, FL 32399-0450 <br />KEVIN J. THIBAULT, P.E. <br />SECRETARY <br /> <br />Safety, Mobility, Innovation <br />www.fdot.gov <br />June 15, 2020 <br /> <br /> <br /> <br />R. Craig Finley Jr., Managing Principal <br />FINLEY ENGINEERING GROUP, INC. <br />1589 Metropolitan Boulevard <br />Tallahassee, Florida 32308 <br /> <br />Dear Mr. Finley: <br /> <br />The Florida Department of Transportation has reviewed your application for <br />prequalification package and determined that the data submitted is adequate to technically <br />prequalify your firm for the following types of work: <br /> <br />Group 4 - Highway Design - Bridges <br /> <br />4.1.1 - Miscellaneous Structures <br />4.1.2 - Minor Bridge Design <br />4.2.1 - Major Bridge Design - Concrete <br />4.2.2 - Major Bridge Design - Steel <br />4.2.3 - Major Bridge Design - Segmental <br />4.3.1 - Complex Bridge Design - Concrete <br />4.3.2 - Complex Bridge Design - Steel <br /> <br />Group 5 - Bridge Inspection <br /> <br />5.1 - Conventional Bridge Inspection <br />5.3 - Complex Bridge Inspection <br />5.4 - Bridge Load Rating <br /> <br />Your firm is now technically prequalified with the Department for Professional Services in <br />the above referenced work types. The overhead audit has been accepted, and your firm may <br />pursue projects in the referenced work types with fees of any dollar amount. This status shall be <br />valid until June 30, 2021 for contracting purposes. <br /> <br />Approved Rates <br />Home/ <br />Branch <br />Overhead <br />Facilities <br />Capital Cost <br />of Money <br />Premium <br />Overtime <br />Reimburse <br />Actual <br />Expenses <br />Home <br />Direct <br />Expense <br />195.22% 1.137% Reimbursed No 2.12% <br /> <br />Per Title 23, U.S. Code 112, there are restrictions on sharing indirect cost rates. Refer to <br />Code for additional information. <br /> <br />QUALIFICATION INFORMATION & ASSIGNED PERSONNEL E <br />CERTIFICATIONS AND LICENSES
The URL can be used to link to this page
Your browser does not support the video tag.